State Level Technical Committee (SLTC) – AMRUT 2.0
All projects are technically appraised and sanctioned by the State Level Technical Committee (SLTC). As per the G.O.(Rt)No.523/2022/LSGD dated 05.03.2022, SLTC for AMRUT 2.0 has been constituted.
Date | Meeting | Agenda | Annexure | Minutes |
---|---|---|---|---|
11.07.2024 | 12th SLTC of AMRUT 2.0 | Download | Annexure2-Approved SWAP3 Annexure3- Buffer list | Download |
24.01.2024 | 11th SLTC of AMRUT 2.0 | Download | Download | |
27.09.2023 | 10th SLTC of AMRUT 2.0 | Download | Download | Download |
14.06.2023 | 9th SLTC of AMRUT 2.0 | Download | — | Download |
10.05.2023 | 8th SLTC of AMRUT 2.0 | Download | — | Download |
16.02.2023 | 7th SLTC of AMRUT 2.0 | Download | Download | Download |
20.12.2022 | 6th SLTC of AMRUT 2.0 | Download | Download | Download |
18.10.2022 | 5th SLTC of AMRUT 2.0 | Download | Download | Download |
22.09.2022 | 4th SLTC of AMRUT 2.0 | Download | Download | Download |
21.06.2022 | 3rd SLTC of AMRUT 2.0 | Download | Download | Download |
25.04.2022 | 2nd SLTC of AMRUT 2.0 | Download | Download | Download |
01.04.2022 | 1st SLTC of AMRUT 2.0 | Download | Download | Download |