Awarding Status – III

The pending milestones – Awarded but not Started as on 15.Nov.2019

The pending milestones – Awarded but not Started
TARGET FOR AWARDING  Awarded but not Started
Num Amount in Cr
WS – KWA 7 31.12
 SEW- KWA 8 10.92
Total KWA 15 42.04
WS – Non KWA 2 32.32
SEW – Non KWA 3 19.08
Storm Water Drainage  21 11.49
Urban Transport 13 16.44
Green Spaces & Parks 0 0
Total Non KWA 39 79.34
Grand Total 54 121.38

 

Progress of Awarding Works 

Category Awarded but not Started
Num Amount in Cr
 KWA Projects 13 49.14
 Non KWA Projects 36 35.19
Grand Total 49 84.33

 

DETAILS OF PROJECTS AWARDED BUT NOT STARTED

No. City Sector Name of Work Impl. Agency Awarded Amount (in Cr.) Work Awrded on Period as per Agreement Responsibility
1 TVM WS Supply and Installation of smart meters (Phase II) KWA 0.67 17-01-2019 6 months MD Office,KWA 
2 TVM WS Replacing existing 150 mm AC  along Ambalamukku – Oolampara road KWA 0.43 01-06-2019 6 months PWD
3 TVM WS Replacing existing 80 mm AC  along Manvila – Pullukadu- Don bosco road KWA 0.10 24-11-2018 6 months PWD
4 TVM SEW TSS – Laying 250 mm dia DI K9  pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction  KWA 1.99 26-05-2018 10 months PWD
5 TVM SEW Laying transmission main and sewer network in blok L Edathara- collection and conveyance system- Supply and laying trunk main from stilling chamber at Udhaya Garden to MH 89- package 3 KWA 1.81 24-06-2019 9 months Contractor
6 TVM SEW Supplying and laying Transmission main in Block K (Akkulam)  to connect Stilling chamber at byepass Jn  to Pumping station at Akkulam. Collection and conveyance KWA 6.29 29-12-2018 6 months NHAI
7 TVM SEW AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line from Jawahar nagar O street towards Bhagavathy nagar A street- under Sewerage Section,Sasthamangalam KWA 0.07 13-11-2018 4 months Contractor
8 TVM SEW AMRUT SAAP  17-18 – TSS- Rehabilitation and up gradation of Existing sewer net work at TRWA area, Podiyadi lane, BRWA area Anil Nagar,Ayilliathu Finance road In Thalial area under sewerage Section No:2 Kuriathy      KWA 0.39 21-01-2019 7 months Contractor
9 TVM SEW AMRUTH -TSS Rehabilitation – Dismantling existing damaged 100mm dia Sw sewer line and laying 200mm dia SW pipe and construction of manholes at Madathuvila Lane Edappazhinji KWA 0.02 31-05-2019 3 months Contractor
10 TVM SEW TSS – AMRUTH -Rehabilitation — Dismantling of damaged brick manhole and re-constructing with RCC manhole at Attara lane, Kannammoola under Sewerage Section Sasthamangalam   KWA 0.04 28-02-2019 3 months Contractor
11 TVM SEW TSS-Rehabilitation and upgradation of existing sewer network at Thakaraparambu, sreekanteswaram Manacaud Aiswarya Nagar Area KWA 0.31 29-11-2018 6 Months Contractor
12 TVM UT Multi level Car parking at Medical College (Opposite of Super speciality block) ULB 11.45 28-02-2019 10 months Contractor
13 TVM SWD 2018/11779 : AMRUT – Storm water drainage system for Aarattu road in Vallakadavu ward ULB 0.3662   4 months  
14 KLM SWD 1.Pullikkada colony ULB 1.228 31-03-2018 12 months ULB
15 KLM UT   1.St Joseph -Parvathy mill Jn ULB 0.67 19-11-2018 5 months KITCO
16 KLM UT 2.S N CollegeJn ULB 0.678 19-11-2018 5 months TKM College
17 KLM UT  3. Kadappakkada ULB 0.76 19-07-2018 8 months ULB
18 ALP SWD Pothante Idavazhi thodu ULB 0.14 19-01-2019 6 months ULB
19 ALP SWD Maanissery thodu ULB 0.09 18-12-2018 6 months ULB
20 KOC WS Construction of 25 LL OHSR at Karuvelippady  KWA 8.44 07-03-2019 12 months MD Office,KWA 
21 KOC WS Construction of 40 LL OHSR  at Kaloor KWA 13.80 30-10-2019 12 months KWA
22 KOC WS Construction of 17 LL OHSR and CWR at Pachalam KWA 7.00 01-11-2019 12 months Contractor
23 KOC UT Walkway along the sides of Thevara Canal near Thevara Market ULB 0.24 17-05-2018 6 months ULB
24 TSR SWD Storm Water Drainage- Div 01, Mangobakery-  Sankaramkulangara ROAD (Sankarankulangara Road), Drain (Work 29 ) ULB 0.30 06-04-2018 4 months ULB
25 TSR SWD Storm Water Drainage Phase 3(Div 2,16TH Street to Girija Thodu ,16TH Street (Harinagar Road, 10TH Street(Harinagar Road) ,11TH Street Harinagar Road ,16TH Street (Punnachal-Harinagar Road) )Work 63 ULB 0.79 08-09-2018 5 months ULB
26 TSR SWD Storm Water Drainage Phase 3(Div 2,Main Street Road1 )Work 64 ULB 0.18     ULB
27 TSR SWD Storm Water Drainage Phase 3(Div 48, Olari center to company padi Road )Work 85 ULB 0.35 06-07-2018 5 months ULB
28 TSR UT Urban Transport  Phase 2 (Div 35,Mundupalam Junction – Avenue, Aristo Road )Work 55 ULB 0.31 13-06-2018 3 months ULB
29 TSR UT Urban Transport Phase 2 (Div 7,Cheroor Kinar Stop – Police Academy Stop )Work 57 ULB 0.50 08-09-2018 5 months ULB
30 TSR UT Urban Transport Phase 3(Div 35, West Side of Shakthan )Work 87 ULB 0.08 03-08-2019 3 months ULB
31 TSR UT Urban Transport Phase 3(Div 31,Ollur Church-Convent Road )Work 88 ULB 0.18 01-04-2019 3 months ULB
32 TSR UT Urban Transport Phase 3, (Footpath near FOB)Work 92 ULB 0.05 02-07-2019 3 months ULB
33 TSR UT Urban Transport Foot Over Bridge at Vadakke stand ULB 0.86 02-07-2019 9 months KITCO
34 GUV SEW Septage Treatment Plant at Chakkumkandam ULB 2.67 21.10.2019 6 months Contractor
35 GUV WS Rejuvenation of Ponds-Phase 1- Kottapadi, Pallichira, Ayyappan kulam and Micha Bhoomi Kulam ULB 2.79 8.11.2018 6 months Contractor
36 GUV WS Rejuvenation of Ponds-Phase 2 Thachara parambil Kulam ULB 29.53     Contractor
37 PKD UT Pattikkara byepass Parking – Cloakroom ULB 0.26 29-05-2018 12 months Contractor
38 PKD SWD Arayakulam SWD ULB 0.46 07-11-2018 6 months Contractor
39 PKD SWD Parakkunnam – Narikuthi SWD ULB 0.48 07-11-2018 6 months Railways
40 PKD SWD New colony SWD ULB 0.47 10-10-2019 6 months  
41 PKD SWD Victoria College- Vidyut Nagar- Indrani Nagar Thodu SWD ULB 0.23 22-02-2018 18 months Railways
42 PKD SWD Widening of manappullikkavu Thirunellayi stream – near yakkara part 2 ULB 0.50 31-10-2018 6 months Contractor
43 PKD SWD widening of manapullikkavu Thirenellayi stream near karim nagar – part 4 ULB 0.50 31-10-2018 6 months Contractor
44 PKD SWD Rejuvenation of drains at housing board colony, Mattumantha, Shekaripuram junction and construction of tertiary drains. ULB 2.91 31-05-2018 18 months Contractor
45 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near toll booth- part 2 ULB 0.50 31-10-2018 6 months Railways
46 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near over bridge- part 3 ULB 0.50 31-10-2018 6 months Railways
47 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near pattikara bypass road – part 4 ULB 0.50 31-10-2018 6 months Railways
48 PKD SWD Karim Nagar Drain part 1 ULB 0.45 07-11-2018 6 months contractor
49 PKD SWD Murukani School Drain ULB 0.094 19-01-2018 6 months ULB
50 PKD SWD Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden Drain ULB 0.46 22-08-2018 6 months contractor
51 KZD WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package-VII KWA 0.68 26-06-2019 6 months Contractor
52 KZD SEW Sewerage Treatment plant at Medical College withSeptage treatment ULB   30.10.2019 8 months Contractor
53 KNR UT Construction of new footpath with handrail ULB 0.4 14.11.2019 5 months Contractor
54 KNR SEW 100 KLD Septage Treatment Plant at Chelora ULB 2.31 12.11.2019 6 months Contractor

 

 

WORK In PROGRESS PROJECTS(ULB)

Sl.
No
ULB SECTOR Name of Work  Remarks
1 TVM SWD Construction of drain on Sreevaraham Kothalam road in Perunthanni Ward   Work started.
2 TVM SWD Construction of drain on Kalluvila road in Chellamangalam Ward   Work started.
3 TVM SWD 2018/11766 : AMRUT – Storm water drainage system for Vazhavila in Puthenpalli ward Work started last week.
4 TVM SWD 2018/11301 : AMRUT – Storm water drainage system for Vadekkad-Kannammoola Thodu road in Kannammoola ward work started last week.
5 TVM SWD Construction of drain in Vellekadavu  Mankuzhi  road in Vazhottukonam Ward   First & Part Bill paid
6 TVM SWD Construction of drain on Vayyanmoola Karali road in Chackai Ward   First & Part Bill paid
7 TVM SWD Construction of drain on Chenchery road in Mannanthala Ward    
8 TVM SWD Construction of drain on Aavukulam – Kallarathala – Valiyavila road in Powdikonam Ward    
9 TVM SWD Plavaracodu colony Uloorkonnam Andoorpoyka Road in Kazhakuttom First & Part Bill paid. Work in progress.
10 TVM SWD Construction of drain on Ambalathinkara pazhaya road in Kazhakuttom Ward   First & Part Bill paid
11 TVM SWD Construction of drain on Kaarali Mudumbil road in Chakkai Ward    
12 TVM SWD Construction of drain on Rajeev Gandhi road in Muttathara Ward    
13 TVM SWD Construction of drain on Cheriyamuttom road in Poonthura Ward   First & Part Bill paid. Work in progress.
14 TVM SWD Construction of drain on Surya Nagar road in Ambalathara Ward    
15 TVM SWD Construction of drain on Moonnammoodu Aruvikkonam road in Kachani  Ward    
16 TVM SWD Construction of drain on Konchiravila Pulimoottil Kadavu road in Attukal Ward   1st & Part Bill paid. Work in progress.
17 TVM SWD 2018/11293 : AMRUT – Storm water drainage system for RC Jn Thampuranmukku Moolavilakam road in Kannammoola ward  
18 TVM SWD 2018/11265 : AMRUT – Storm water drainage system for Sub Lane-Gowreeshwapattom road in Kunnukuzhy ward Bill under process.
19 TVM SWD 2018/10249 : AMRUT-Storm water drainage system for Kunnukuzhy colony in Kunnukuzhy ward Bill under process.
20 TVM SWD 2018/11995 : AMRUT – Storm water drainage system for Nethaji road in Poojappura ward Bill under process.
21 TVM SWD 2018/11997 : AMRUT – Storm water drainage system for Cherukara Naduthala road in Poojappura ward 1st & Part Bill paid. Work in progress.
22 TVM SWD 2018/11289 : AMRUT – Storm water drainage system for Pattor Jn-EMS Nagar road in Kannammoola ward work  started after issuing second notice.
23 TVM SWD 2018/11273 : AMRUT – Storm water drainage system for Athani Link road, Chavarachi in Vanchiyoor ward Bill under process.
24 TVM SWD 2018/11339 : AMRUT – Storm water drainage system for Kochar road towards Killipalam in Valiyasala ward Work in progress.
25 TVM SWD 2018/11570 : AMRUT – Storm water drainage system for Maruthoor Kadavu towards Elamthengu road (Parapachivila-Vittiyur road) in Kalady ward Work in progress.
26 TVM SWD 2018/11566 : AMRUT – Storm water drainage system for Soman Nagar Kalady road in Nedumcaud ward Work in progress.
27 TVM SWD 2018/11770 : AMRUT – Storm water drainage system for Valiyathura-Muttathara road-Sewage Farm road in Bheemapally ward Work in progress.
28 TVM SWD 2018/12037 : AMRUT – Storm water drainage system for Kowdiar Tennis Club road in Kowdiar ward Work in progress.
29 TVM SWD 2018/11304 : AMRUT – Storm water drainage system for Kanaka Nagar (Nanthankode to Vellayambalam) in Nanthancode ward Work in progress.
30 TVM SWD 2018/11303 : AMRUT – Storm water drainage system for PMG to Charachira road in Nanthancode ward Work in progress.
31 TVM SWD 2018/11325 : AMRUT – Storm water drainage system for SS Kovil road-LHS in Thampanoor ward Part bill submitted. Work in progress.
32 TVM SWD 2018/11323 : AMRUT – Storm water drainage system for SS Kovil road-RHS in Thampanoor ward Part bill submitted. Work in progress.
33 TVM SWD 2018/11276 : AMRUT – Storm water drainage system for Chettikulangara road in Vanchiyoor ward Work in progress.
34 TVM SWD 2018/11277 : AMRUT – Storm water drainage system for AKG Center-Kunnukuzhi road in Kannammoola ward Work in progress.
35 TVM SWD 2018/11331 : AMRUT – Storm water drainage system for C V Raman Pilllai road (Pound road) in Thycaud ward Work completed.
36 TVM SWD 2018/11768 : AMRUT – Storm water drainage system for Paruthikuzhi road in Puthenpalli ward Work in progress.
37 TVM SWD 2018/11292 : AMRUT – Storm water drainage system for Petta-Alimukku road in Kannammoola ward Work in progress.
38 TVM SWD 2018/11333 : AMRUT – Storm water drainage system for Mettukada-Killypalam road in Thycaud ward 1st & Part Bill paid. Work in progress.
39 TVM SWD 2018/11669 : AMRUT – Storm water drainage system for Old Karaykkamandapam Pottavila in Ponnumangalam ward Work in progress.
40 TVM SWD 2018/11575 : AMRUT – Storm water drainage system for Vellayani Jn-Ponnumangalam in Ponnumangalam ward 1st & Part Bill paid. Work in progress.
41 TVM SWD 2018/11334 : AMRUT – Storm water drainage system for DPI road in Thycaud ward Work in progress.
42 TVM SWD 2018/11799 : AMRUT – Storm water drainage system for NCC Road in Chettivilakam ward Work completed. 
43 TVM SWD 2018/11798 : AMRUT – Storm water drainage system for Marappankode Sreebhadra Nagar road in Chettivilakam ward Work completed.
44 TVM SWD 2018/11336 : AMRUT – Storm water drainage system for Valiyasala DD Office-Santhikavadam Kochar road in Valiyasala ward Work in progress.
45 TVM SWD 2018/11574 : AMRUT – Storm water drainage system for Kulathara Jn bus stop to Karamana river (Parapachivila-Vittiyur road) in Kalady ward Work in progress.
46 TVM SWD 2018/11341 : AMRUT – Storm water drainage system for Quarters to Melarannoor LHS in Aranoor ward Work in progress.
47 TVM SWD 2018/12035 : AMRUT – Storm water drainage system for Green Street road in Poojappura ward 1st & Part Bill paid. Work in progress.
48 TVM Urban Transport Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot) Phase l Work progressing as per schedule. Likely to complete by October last week.
49 TVM Urban Transport Multi level parking at Corporation premises and Chalai (behind of Putharikandam maithanam and transport depot) Phase Il Site cleareance and tree cutting going on.
50 TVM Green Space & Parks Developing one park, Phase I work started. Cycle track and walkway concreting going on. 
51 TVM Green Space & Parks Developing one park, Phase II work started. Cycle track and walkway concreting going on. 
52 TVM Green Space & Parks Developing one park, Phase III work started. Cycle track and walkway concreting going on. 
53 KLM SWD                Uliakovil-Ashtamudi Drain-Phase II  
54 KLM SWD                        Uliakovil Area   
55 KLM   Kuttichira- Kilikkollur Area  
56 KLM   .Mangad – Arunoottimangalam –                     Karikkodu Area  
57 KLM    Thangasserry Area  
58 KLM   Sakthikulangara Area  
59 KLM SWD . Vadakkevila-Eravipuram Area  
60 KLM   SMP Colony-  Contonment  
61 KLM   Mundakkal Area  
62 KLM   Kavanad Area   
63 KLM SWD .Kuttichira- Kilikkollur Area  
64 KLM   Mangad – Arunoottimangalam –                     Karikkodu Area  
65 KLM   Sakthikulangara Area  
66 KLM    Vadakkevila- Eravipuram Area  
67 KLM   Kavanad Area   
68 KLM   2.Thangasseri area  
69 KLM UT (FOB) High School Jn.  
70 KLM  UT (Staircase) Stair case in over bridge near Municipal building Chinnakkada  
71 KLM  UT(FP) Construction and Renovation of Foot Path and supporting structures – Phase II               
72 KLM   Construction and Renovation of Foot Path and supporting structures – Phase III             
73 KLM   Construction and Renovation of Foot Path and supporting structures – Phase IV             
74 KLM WS Rain Water Harvesting-Phase 1  
75 KLM   Rain Water Harvesting – Phase 2  
76 KLM Parks TM Varghese Park  
77 KLM   Veliyilkulangara  
78 KLM   chemmamukku  
79 KLM   TK Divakaran Park  
80 KLM   Asraamom  
81 ALP SWD Improvement of Ayyappan pozhi with walkways  
82 ALP SWD Improvement of Thumboli Pozhi  
83 ALP SWD Improvement of Vadapozhi  
84 ALP SWD kottachira west culvert  
85 ALP SWD Paatiyam Jn  
86 ALP SWD Drain near Iyyambi Company -North to Byepass  
87 ALP SWD Athipparamb Drain  
88 ALP SWD Drain near Kiradharudhra Temple to Vilanghoor – Thiruvambady Temple road  
89 ALP SWD KPRA House no74 to Punnamada  
90 ALP SWD Chemmarappali chira thodu  
91 ALP SWD Thapal Parambu Drain  
92 ALP SWD Navodayam vayanasala  
93 ALP SWD Drain Near Theerezham Potharam Paddy Field to Ankanavadi  
94 ALP SWD Kollappally to Paatiyam Jn  
95 ALP SWD Kunnel thodu  
96 ALP SWD Drain near Kuthirapanthy Byepass near SNDP School  
97 ALP SWD Paalappally thodu  
98 ALP SWD Punnammada – Panakkal chira thodu  
99 ALP SWD Alappuzha Company thodu  
100 ALP SWD Avaloormadam Temple gate  
101 ALP SWD Drain Near Krishnapilla Jn to AC Road  
102 ALP UT Pedestrian Network at Gurumandiram Jn  
103 ALP SWD Drain near Kidangamparambu Temple  
104 ALP SWD Near Thottathil Road Culvert  
105 ALP SWD Drain near to Antony Agencies to Puthemparambu  
106 ALP SWD Drain from Church of Christ Culvert to St.Martin De Pores Chappel STRECH-2  
107 ALP SWD Drain from Yuvajana Vayanashala to Puthenpurakkal near Mythilli Jn  
108 ALP SWD Drain near Idukk Jn  
109 ALP SWD Mukkayal thodu  
110 ALP SWD Drain near Kandathil Kaapil  
111 ALP SWD Valiyamaram Punnakkal  
112 ALP SWD Various drains in Valiyukulam Ward  
113 ALP SWD Drain near rahmathil islam mosque to Housing board Culvert  
114 ALP SWD Drain Near Mannam School  
115 ALP SWD Railway Cross East Vadapozhi  
116 ALP SWD Vadakkekara thodu (Vadapozhi North Branch)  
117 ALP SWD Drain Joining Vadapozhi  
118 ALP SWD Ooty Jn thodu joining Kommadi Thodu  
119 ALP SWD Drain near Chemmukath Sree Subrahmanya temple to Badikkad House  
120 ALP SWD Drain near Mammootil Culvert to Parathan Culvert  
121 ALP SWD Various Drains in Poonthopp ward  
122 ALP UT Pedestrian Network at Veliyaakulam  
123 ALP SWD Boundary Canal between Kuthirapanthy and Railway Station at Railway Station Ward  
124 ALP SWD Kaithavalap Bharath krishna Vilasam  
125 ALP SWD Avaloormadam Thekke Junction  
126 ALP SWD Zachariya Junction  
127 ALP SWD Thadickel Vadakke Veedu to Thundu Thadickel House near Kalath road  
128 ALP SWD Drain Near Araattuvazhi Shaap Jn  
129 ALP SWD Various Drains in Kuthirapanthy Ward  
130 ALP SWD Drain Near Ankanavadi 102 to Kailasa Nagar West Road  
131 ALP SWD Kalath Road to Kochu Parambu House near Thalavady Road  
132 ALP UT FOB at Purathuchira  
133 ALP UT FOB in Karalakam ward  
134 ALP UT FOB at 8acre  
135 ALP SWD Drain from Church of Christ Culvert to St.Martin De Pores Chappel STRECH-1  
136 ALP SWD Drain from Church of Christ Culvert to St.Martin De Pores Chappel STRECH-3  
137 ALP SWD Drain near in Thathampally ward  
138 ALP SWD Drain near West Railway Cross (Various branches of Vadappozhi Canal)  
139 ALP UT FOB at Beach ward  
140 ALP SWD Drain Behind collectorate  
141 ALP SWD Ettil Bhagham Drain  
142 ALP SWD SN Kavala roadculvert to Railway station road culvert at Railway Station Ward  
143 ALP SWD Madathipparambil to Kollappalli Thodu at Thathampally Ward  
144 ALP SWD Ramda Hotel Jn to Punnamada Backwaters at Zilla Court Ward  
145 ALP SWD Drain near Puniyil Road Culvert at Thathampally Ward  
146 ALP SWD Vattakkeril Thodu Culvert at Thathampally Ward  
147 ALP SWD Ponvelil temple road thodu at Thathampally Ward  
148 ALP UT FOB between Chungam bridge and Outpost-2  
149 ALP UT FOB opposite Municipal bus stand  
150 ALP UT FOB across A.S Canal  
151 ALP UT FOB across Kavi thode i  
152 ALP UT FOB across Kavi thode ll  
153 ALP UT FOB at Pazhaveed  
154 ALP UT FOB at gandhivilasam  
155 ALP UT Pedestrian Network at Zachariya Jn  
156 ALP Park Construction of Park at Town Square  
157 ALP UT Construction of Pedestrian network from Thiruvambady Temple west gate to NH  
158 ALP PARK Construction of Park at Chathanad – Phase 1  
159 ALP SWD Drain near Zilla Zainik Welfare office to St Sebastian Church Road  
160 ALP PARK Construction of Park at Chathanad – Phase 2  
161 ALP SWD Opposite Parathara Car Parking  
162 ALP SWD SN Jana Sang to Punnamada  
163 ALP UT Pedestrian network at Gandivilasam  
164 ALP PARK Development of Valiyachudukadu park phase -l  
165 ALP PARK Development of Valiyachudukadu park phase -ll  
166 ALP PARK Development of Valiyachudukadu park phase- lll  
167 ALP UT Pedestrian Network at Mannam School Road  
168 ALP UT Pedestrian Network at Punnamad Jetty Jn  
169 ALP SWD Near nattukootam Junction(MANGALAM-2 )  
170 ALP SWD Drain behind Vatikad School  
171 ALP SWD Thaikkoottam to Karalakam Padam  
172 ALP SWD Kannattchira to Panackal Thodu  
173 ALP SWD Drain near Thathampally School  
174 ALP SWD Chirammel pulimchira – Ilangmadam thodu  
175 ALP UT Pedestrian Network at Chungam  
176 ALP SWD Drainage at Indira Jn to IOC culvert  
177 ALP SWD Oppo Ramda Continuation to Existing Drain at Zilla Court Ward  
178 ALP SWD Near Kathiresan House to Kalath Road  
179 ALP SWD KK Ponnappan Road – Vattayal Drain  
180 ALP SWD Jain temple & United club to chandakkadavu  
181 ALP SWD Drain near Sri Krishna Ashramam  
182 ALP SWD Drain From Vattayal Road To Shobas House  
183 ALP UT Pedestrian Network at Kuthirapanthy Jn  
184 ALP SWD Drain Near Pakki Court Jn to 100KVA transformer  
185 ALP SWD Various Drains in Vada Canal Ward  
186 ALP SWD Dran joining Ayapan Pozhi to ESI jn  
187 ALP SWD Drain near Vattayal Kurishadi to West of Vettakkaran Jn  
188 ALP SWD DRAIN AT VANYAMPARAMBU  
189 ALP SWD Near Maximillian Kolbe road  
190 ALP SWD Charunthara thodu at Palace Ward  
191        
192 KOC SWD Sub-drain to PunchaThodu Vyttila  
193 KOC SWD Rejuvenation of  Kanichat Thodu  
194 KOC SWD Renovation of Pandara chal canal-second phase  
195 KOC SWD Sub drain of PashniThodu  
196 KOC SWD Renovation of Rameswaram canal  
197 KOC SWD Renovation of Karanakodam Thodu & AdimuriThodu  
198 KOC SWD Renovation of Valiya Thodu – Gandhi square jawahar road west side and Thodu along ayyankali road  
199 KOC SWD Renovation of PashniThodu sub drains,drain up to Pambayimoola-east side of PashniThodu  
200 KOC SWD Rejuvanation of PashniThodu  
201 KOC SWD Rejuvenation Thevara-Perandur canal  
202 KOC SWD Stadium Link road drain construction  
203 KOC SWD Rejuvenation of sub drains of Perandoor canal at Pottakuzhy  
204 KOC SWD Rejuvenation & Desilting and repairs of Earanad and Kattathra thode at Konam area &   
205 KOC SWD Renovation of Changadampokku Thodu (George Eden road to Ammu Sahib road and National Public School road to Mamamangalam pottakuzhi road) including cross culvert uplifting across Changadam pokku Thodu  
206 KOC SWD Sarovaram drainage vytila  
207 KOC SWD Mantra canal  
208 KOC SWD Drain along  Mamangalam Anjumana road, Edappally Arakkakadavu road in Devankulangara & Karivelil road  
209 KOC SWD Drain both sides of Konthuruthy road from Thevara Mattammal juncion towards east and Mattammal junction to thevara college  
210 KOC SWD New construction of drainage from PF Quarters to dry Thodu & Kumaranashan jn – St. Sebastian church to Dry Thodu   
211 KOC SWD Side protection of Changadampokku Thodu from Karukappilly abad towards north to bts road & repair Valiyaparamba Thodu and Keerthi nagar colony drains  
212 KOC SWD Renovation of Kalluchira Valiya canal div-19  
213 KOC SWD Renovation of Kannachan Thodu and drain along Mathai Manjooran road div-68  
214 KOC SWD Rail Nagar Thodu  
215 KOC UT Walkway along Kadavanthara to KV school&Market  
216 KOC UT Walk way along Karanakodam Thodu (kathrikadavu to pipeline jn)  
217 KOC UT Walkway/Foot path along both sides of Chambakkara canal roads  
218 KOC UT Construction of walkway from Petta junction to Gandhi square both sides  
219 KOC UT Walkway near JLN stadium, pipe line road.  
220 KOC UT Footpath along Moolamkuzhy beach road -Moolamkuzhy  
221 KOC UT Foot path along Nazarath- Janatha-Jubile Road-both sides  
222 KOC UT Walkway along Panorama road on both side of canal  
223 KOC UT Construction of Sarovaram Walkway and cycle track  
224 KOC UT Construction of footpath and bus bays including junction development at Thoppumpady  
225 KOC UT Development of Pambayimoola Indira ghandi Road junction  
226 KOC UT Construction of footpath and bus bays including junction development at Thevara junction  
227 KOC UT Subhash Chandra bose road  
228 KOC UT K.P. Vallon road.  
229 KOC UT Footpath along Girinagar Club road  
230 KOC UT Footpath along Chittoor Road at Perandur  
231 KOC UT Walkway along the sides of TP Canal, Panambilly nagar  
232 KOC PARK Kudumbi Colony Green Space  
233 KOC PARK New Park at Vyttila Near Chilavannur Kayal  
234 KOC PARK Mythri Nagar Park  
235 KOC PARK Vypin Jetty Green Space Development  
236 TCR SWD Storm Water Drainage Phase 1 (Div 35. ST.Josephs Schooil Cemetery RD 1,ST.Josephs Schooil Cemetery RD 2) Work 19  
237 TCR SWD Storm Water Drainage Phase 1 (Div 38. Jayalaksmi-Railway station) Work 20  
238 TCR SWD Storm Water Drainage Phase 2-(Div 5,Thrissur Government Engineering College Road) Work 37  
239 TCR SWD Storm Water Drainage  Phase 2 (Div 9,Cheroor school-Cherutta Road )Work 41  
240 TCR SWD Storm Water Drainage Phase 2 (Div 23,Thoppe Stadium Ground Road )Work 51  
241 TCR SWD Storm Water Drainage  Phase 2 (Div 31, Ollur Church-Convent Road,Convent Road,Pallinada Road Part 1, Pallinada Road Part 2 ) Work 54  
242 TCR UT Urban Transport  Phase 2 (Div 3, Aswani Junction – Pattraikal – Girija Theatre – Viyyur bridge )Work 58  
243 TCR SWD Storm Water Drainage Phase3(Div 37, Chakkamukku Centre-Kottapuram MainRoad Westend Super Market Vanian  Lane)Work 65  
244 TCR SWD Storm Water Drainage  Phase3(Div 11,Museum Cross Road )Work 76  
245 TCR SWD Storm Water Drainage  Phase3(Div46, TS Parameshwaran Road )Work 78  
246 TCR UT Urban Transport Phase 3(Div 34, south pentark flat -Elite mission hosp )Work 91  
247 TCR UT Urban Transport SUBWAY at M O Road  
248 TCR Park Rennovation of Nehru park -phase 3  
249 TCR SWD Storm Water Drainage Phase1(, Div 35. West Side of Sakthan Bus Stand) Work 17  
250 TCR SWD Storm Water Drainage  Phase 1 (Div 33. Alumvettuvazhi Essykkunnu Road,Div 34. Koorkanchery-Chiyaram) Work 21  
251 TCR UT Urban Transport – Div 37, Sankaramkulangara-Aravind Complex MG Road,Footpath(Work 22)  
252 TCR UT Urban Transport  Div 1, Seetharamaswami Temple, Footpath(Work 23)  
253 TCR UT Urban Transport Div 5, GOVT Engineering College, Footpath( Work 24)  
254 TCR UT Urban TransportDiv 2, Pookunnam-patturaikal, Footpath (Work 26 )  
255 TCR SWD Storm Water Drainage-  Phase 2 (Div 1,Kuruvath Lane) Work 34  
256 TCR SWD Storm Water Drainage-  Phase 2 (Div 4,Viyyur Aduthodu )Work 36  
257 TCR SWD Storm Water Drainage-  Phase 2 (Div ,Peringavu -Cheroor Road )Work 39  
258 TCR SWD Storm Water Drainage-  Phase 2 (Div 20, Paravattani Nellikkunnu Jn )Work 43  
259 TCR UT Urban Transport  Phase 2 (Div 35, Aristo road-St. Joseph convent girls School )Work 56  
260 TCR UT Urban Transport Phase 3(Div 23 – Thoppe Stadium)Work 60  
261 TCR SWD Storm Water Drainage Phase3(Div 2,Poomkunnam to Patturaikal Road ),Work 62  
262 TCR SWD Storm Water Drainage Phase 3(Div 7,Cheroorkinnar Stop-Police Academy Stop )Work 66  
263 TCR SWD Storm Water Drainage Phase 3(Div 7,Police Academy OPP Road )Work 67  
264 TCR SWD Storm Water Drainage Phase 3(Div 7,Kuttumukku Vadakkevettuvazhi Road )Work 68  
265 TCR SWD Storm Water Drainage Phase 3(Div 24, Anchery School-Valarkavu Centre Road )Work 71  
266 TCR UT Urban Transport Phase 3(Div 32,CHIYYARAM SOUTH-PALAKKAL MAIN ROAD )Work 80  
267 TCR SWD Storm Water Drainage Phase 3(Div,12 )Keerankulangara pond back side Work 81  
268 TCR UT Urban Transport Phase 3(Div 34,Shakthan Nagar )Work 89  
269 TCR UT Urban Transport Sky walk  
270 TCR PARK Rejuvenation of  Vanchikulam Park  
271 TCR PARK Renovation of Achutha menon park  
272 TCR PARK Rejuvenation of Panamkuttichira pakalveedu park  
273 PKD UT+BB285,C286:C290 Escalator to be provided at GB road to cross railway line  
274 PKD UT Mayins Girls high school to Mayins LP school FOB  
275 PKD UT PMG higher secondary School to Victoria College FOB part 1  
276 PKD UT PMG higher secondary School to Victoria College FOB part 2  
277 PKD UT Mission High School FOB  
278 PKD UT Victoria college to Anchvilak pedestrian network  
279 PKD UT Bus shelters Model 3  
280 PKD UT Melamuri- Kalmandapam footpath  
281 PKD UT Parking near CSI hostel  
282 PKD UT Parking infront of Chinmaya Mission  
283 PKD UT Mission School – Sakunthala Junction footpath  
284 PKD UT Olavakkode Junction to Railway Station footpath  
285 PKD UT Robinson Road Footpath  
286 PKD UT Construction of river side walkway along Kalpathy River bank – Part 1  
287 PKD UT Construction of river side walkway along Kalpathy River bank – Part 2  
288 PKD UT Construction of river side walkway along Kalpathy River bank – Part 3  
289 PKD UT Pedestrian pathway at IMA Jn. to Stadium stand  
290 PKD UT Bus stand yard  
291 PKD UT 100ft road bicycle track – Urban Transport  
292 PKD UT Foot overbridge over thodu near neeratuganapathy temple – Urban Transport  
293 PKD UT 100ft road bicycle track – Urban Transport-foot bridge over Thodu- ch -0-905m  
294 PKD SWD Widening of Manappullikkav Thirunellayi stream and construction of culvert – Near Padath Colony  
295 PKD SWD widening of manappullikkavu Thirunellayi stream – near yakkara part 2  
296 PKD SWD widening of manapullikkavu thirunellayi stream – near yakkara and karim nagar part 3  
297 PKD SWD widening of manapullikkavu Thirenellayi stream near karim nagar – part 4  
298 PKD SWD Rejuvenation of drains around Sakunthala junction and construction of tertiary drains  
299 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near toll booth- part 2  
300 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near over bridge- part 3  
301 PKD SWD Rejuvenation of drain around Sakunthala junction and construction of tertiary drain -near pattikara bypass road – part 4  
302 PKD SWD Rejuvenation of drains at housing board colony, Mattumantha, Shekaripuram junction and construction of tertiary drains.  
303 PKD SWD Thirunellayi Manappullikkavu Thodu  
304 PKD SWD Thirunellayi Manappullikkavu Thodu- between thirunellayi and Chadanakurissi  
305 PKD SWD Thirunellayi Manappullikkavu Thodu- After thirunellai bridge – part3  
306 PKD SWD Thirunellayi Manappullikkavu Thodu- near thirunellayi – part 4  
307 PKD SWD Selva palayam- Indira Nagar SWD  
308 PKD SWD Chadanakurissi SWD  
309 PKD SWD Sreeramapalayam SWD  
310 PKD SWD Kallikkad SWD  
311 PKD SWD Karim Nagar Drain part 1  
312 PKD SWD Karim Nagar Drain part 2  
313 PKD SWD Chakkamthara- Kaikuthu parambu drain  
314 PKD SWD Chakkamthara – Kaikuthu parambu behind Nurani gramam- part 2  
315 PKD SWD Karukodi SWD  
316 PKD SWD Kaalambuzha thodu SWD  
317 PKD SWD Selvinagar thodu SWD  
318 PKD SWD Manakkathodi secondary SWD  
319 PKD SWD Vadakkanthra road secondary drain Part 1  
320 PKD SWD Vadakkanthara road secondary drain – near temple -part 2  
321 PKD SWD GB road to Noorjahan secondary drain  
322 PKD SWD Maettupalayam street drain Part 1  
323 PKD SWD Maettupalayam street drain near jos alukkas -part 2  
324 PKD SWD Olavakkode- Near co operative SWD  
325 PKD SWD Mattumantha Palayam – Chulliyodu storm water drain  
326 PKD SWD Mattumantha Palayam – Chulliyodu drain- near Jaladha nagar – part 2  
327 PKD SWD Manalai- Ramanadhapuram- Aanachira Drain  
328 PKD SWD Manalai- Ramanadhapuram- Aanachira near ramanathapuram – part 2  
329 PKD SWD Sekharipuram- Sankhuvaramedu Drain  
330 PKD SWD Sekharipuram- Sankhuvaramedu- near anganwadi – part 2  
331 PKD SWD Murukani School Thodu SWD  
332 PKD SWD Stadium bypass- Srekrishna Temple- Valiparamb SWD  
333 PKD SWD Palayapetta- Stadium Bypass SWD  
334 PKD SWD Chirakkad- Gopal colony SWD  
335 PKD SWD Kalmandapam- Chittoor Road Drain  
336 PKD SWD kalmandapam chittoor road near kunnathurmedu -part 2  
337 PKD SWD Chirakkad- Aiswarya Nagar SWD  
338 PKD SWD Sulthanpetta- Kalmandpam- NH Road drain Desilting and rejuvenation  
339 PKD SWD Mercy College- Thirunellayi drain LHS Part 1  
340 PKD SWD Mercy College- Thirunellayi- near mercy junction -part 2  
341 PKD SWD Mercy College- Thirunellayi- RHS  
342 PKD SWD Vennakkara- Thirunellayi Drain  
343 PKD SWD Vennakkara- Thirunellayi- near anugraha colony – part 3  
344 PKD SWD Puthur Temple- Kallepully Junction-Rhs- part 2  
345 PKD SWD Housing Board Colony- Mathrubhumi SWD  
346 PKD SWD Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden Drain  
347 PKD SWD Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden- near venkateshwara garden part 2  
348 PKD SWD Chakkanthara- Kaikuthparambu- Venkiteshwaragarden- Sreenivasa Garden- near surya garden – part 3  
349 PKD SWD Head Post office to Ramanadhapuram via Koppam Drain  
350 PKD SWD Selvi Nagar – Ram Nagar SWD  
351 PKD SWD Melamuri- Kalambuzha- Karukoodi SWD Part 1  
352 PKD SWD Melamuri- Kalambuzha- Karukoodi SWD Part 2  
353 PKD Parks Kotta Maidanam and Cheriya Kotamaidan Rejuvanation  
354 PKD Parks Aiswarya Nagar Park  
355 PKD Parks Jaladha Nagar park  
356 PKD Parks A R menon Park  
357 PKD Parks Vandana Layout park  
358 PKD Parks Krishnaswamy Iyer park  
359 PKD Parks Salamath nagar park  
360 PKD Parks Dr Krishnan park  
361 PKD Parks Gandhi Nagar park  
362 PKD Parks Venkiteshwara Garden park  
363 PKD Parks Sriram Park  
364 PKD Parks Meena nagar park  
365 PKD Parks Mythri Nagar park Nurani  
366 PKD Parks Nila Nagar park olavakkode  
367 PKD Parks Ganesh Nagar park- Kalpathy  
368 PKD Parks Nurani Park  
369 KOZ SWD Construction of storm water drain at People Road- Karaparamba HSS-E K canal  
370 KOZ SWD Cleaning of B K Canal   
371 KOZ UT Construction of Foot over bridge with escalators near new bus stand   
372 KOZ SWD Construction of drain at Gurukkal Road – PM kutty road -Chakkittida –EK canal   
373 KOZ SWD Construction of drain at Benz automobiles-Passport office-EK Canal   
374 KOZ SWD Construction of storm water drain at Manorama- Kattuvayal- sale tax office- EK canal Drain  
375 KOZ SWD Mavoor road north side drain  
376 KOZ SWD Construction of storm water drain at Palayam Samuthiri cross road to E K Canal  
377 KOZ SWD Construction of storm water drain at North of Azhakodi Temple – EK canal   
378 KOZ SWD Construction of storm water drain at YMRC Road –Millathu Colony  
379 KOZ SWD Construction of storm water drain at Nadanchery Ayyankar Road – Kallayi River  
380 KOZ Parks Renovation of Mananchira park   
381 KOZ Parks Renovation of  Jetty Park  
382 KOZ Parks Development of  Eravathkunnu V K Krishnamenon park  
383 KOZ Parks Renovation of S K Pottakkadu Park, Puthiyara  
384 KOZ Parks Renovation of Thadambattuthazham park  
385 KOZ Parks Renovation of Garudankulam park  
386 KOZ Parks Renovation of Malaparamba park  
387 KOZ Parks Renovation of Cheruvannur children’s Park  
No. City Sector Name of Project  
388 KNR SWD Mullankandi thodu & connecting drains  
389 KNR SWD Kakkad & connecting drains  
390 KNR SWD Kanampuzha & connecting drains  
391 KNR SWD Anjukandy & connecting drains  
392 KNR SWD Ammaiyithodu & connecting drains  
393 KNR SWD Varam vayal and connecting drains  
394 KNR SWD Varam vayal and connecting drains- phase 2  
395 KNR SWD Chalathodu & connecting drains  
396 KNR SWD Thottadathodu & connecting drains  
397 KNR UT Construction of  cycle track  
398 KNR UT Construction of  cycle track phase II  
399 KNR UT Construction of new footpath  phase II  
400 KNR PRK Rejuvenation of SN Park  
401 KNR PRK Rejuvenation of Babu Rajendra park.  
402 KNR PRK Rejuvenation of Avera Gramamandiram park.  
403 KNR PRK Renovation of Kappad Sisumandiram park
 
 
404 KNR PRK Development of New Payyambalam park   
405 KNR PRK Development of Anakulam park  
406 KNR PRK Development of Chelora park  

 

 

 

WORK In PROGRESS PROJECTS(KWA)

Sl.No City Sector Name of Work Remarks
1 TVM WS Improvements of Water Supply Scheme- Construction of 75mld Water Treatment Plant at Aruvikkara Work started
 
2 TVM WS Improvements of Water Supply Scheme- Construction of 75mld Water Treatment Plant at Aruvikkara -do-
3 TVM WS Construction of Smart Office in Thiruvananthapuram- Kowdiar, Pongumoodu, Vellayambalam  Work Started for Pongumoodu Office
4 TVM WS Supply and Installation of smart meters (Phase I) Work started. Metres supplied and 146meters installed. Developing interlinking software
5 TVM WS Installation of Flow meters Agreement executed on 29/07/2019 and Work started.
6 TVM WS Replacing existing 100 mm AC along Chakkala mukku – Society mukku Pipe supply completed. Work in progress.
7 TVM WS Replacing existing 125 mm AC  along Pipinmoodu – Golflinks road Work in progress
8 TVM WS Replacing existing 80 mm AC  along Monvila Ushus Nagar to Chenkodikkadu Pipe supply completed. Work in progress.
9 TVM WS Replacing existing 150 mm CI  along Mulavan Jn- Gowreesapattom-Pottakuzhy Work in progress
10 TVM WS Replacing existing 80 mm AC  along Amabalamukku NCC road Work in progress. Pipe laying 500m completed along Corporation road.
11 TVM WS Replacing existing 100 mm AC  along Vayalikkada – Madathunada road Agreement executed. Pipe supply completed. Work in progress.
12 TVM WS Replacing existing 100 mm AC  along Varambassery road Agreement executed. Pipe supply completed. Work in progress.
13 TVM WS Replacing existing 100 mm AC  along Rajaji Nagar in Thampanoor ward Work in progress.
14 TVM WS Replacing existing 150 mm AC  along Arasumoodu to Thippatti temple road Agreement executed. Pipe supply completed. Work in progress.
15 TVM WS Replacing existing 80 mm AC  along Monvila tank to Thalavarambu Temple road Agreement executed. Pipe supply completed. Work in progress.
16 TVM WS Replacing existing 80 mm AC  along Manvila Jn to Nirmalayam road Agreement executed. 
17 TVM WS Replacing existing 100 mm AC  along Madathunada – Perappoor road Work completed. Bill under process.
18 TVM WS Replacing existing 100 mm AC  along Kunnukuzhi road Agreement executed. Pipe Supply completed. Work in progress.
19 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc pipe line and alteration of house connection at Konchiravila area under Kuriathy section Work completed. Bill under process.
20 TVM WS Replacement of existing 100mm GI pipe with 110mm pvc at Chalai area Pipe supplied. Work in progress.
21 TVM WS TWSS – Alteration of House connections to the JICA and Jnnurm line in Cheriyamuttam area (Package 1) Offer received after tendering 4 times. Work order issued and agreement executed. Work in progress.
22 TVM WS TWSS – Alteration of House connections to the JICA and Jnnurm line in Poonthura church area (Package 2) Offer received after tendering 4 times. Work order issued and agreement executed. Work in progress.
23 TVM WS TWSS MACE AMRUT Proposal-Providing new connection and alterations of house connection from  JICA/JUNNRUM Project laid lines in Beemapally, Beemapally east and Manikavilakam wards under Kuriathy section (Package 3) work in progress.
24 TVM WS Package 4 – Replacement of 100mm AC pipes and laying 110mm PVC at Mankeezh line at Sreevaraham under Kuriathy section Work order issued. Agreement executed. Work in progress.
25 TVM WS Replacing old AC main with 140mm,110mm and 90mm PVC pipes along Sree rangam lane, Elankom gardens, judge lane in Sasthamangalam ward Work completed. Bill under process.
26 TVM WS Replacing old AC service main pipes with 110mm, 90mm, UPVC Pipes at CSM Nagar in Vazhuthacaud ward, Thiruvananthapuram Work completed. Bill under process.
27 TVM WS Replacing old AC main and Laying of 110 mm PVC 6kg/cm2 pipe at Vellayani Junction,Studio Road to Plankalamukku, Nemom ward Work completed. Bill under process.
28 TVM WS Replacing old AC service main pipes with 110mm,90mm UPVC pipes at Udarasiromany Road and Palottukonam in Vazhuthacaud ward, Thiruvananthapuram Work in progress. To be completed by next week. 
29 TVM WS Replacing old AC service main pipes with UPVC main along Panickers Lane and Mangalam Lane in Sasthamangalam Ward, Thiruvananthapuram Work completed. Bill under process.
30 KLM SEW Supplying Conveying Laying 900mm dia DI pumping main at Muttathara Sewage Treatment Plant and construction of new bridge with pile foundation and allied works Work completed. Bill under process.
31 KLM SEW Decentralized  5 mld Sewerage plant (STP) at Medical College including water recycling plant and reuse Excavation works goingon.
32 KLM SEW Decentralized  5 mld Sewerage plant (STP) at Medical College including water recycling plant and reuse Excavation works goingon.
33 KLM SEW Supplying and Laying 600mm dia DI Pumping main from Pump at Edathara to  STP at Muttathara Work Order issued on 22/09/18 and Agreement executed on 28.03.2019. Pipe inspection conducted and work started. KRFB crossing before Chakka bridge(12m) to be obtained. NHAI sanction at Lords hospital(300m) to be obtained.
34 KLM SEW AMRUTH – TSS Rehabilitation – Relaying damaged 300mm sw pipe from Parachal Jn in Malloor road to Devi pharma Junction and construction of dilapidated man holes at Thumbara lane in Vanchiyoor ward Work completed. Bill under process.
35 KLM SEW AMRUTH- TSS Rehabilitation – Reconstruction of dilapidated man holes at Ambujavilasom, malloor road, Chettikulangara, Athani, Amba nagar, Mullassery, Chirakkulam, Thengapura, Mulluvilakom, Pettah, Rishimangalam, Palkulangara, Chempakassery, Kaithamukku, Pattoor etc under Sewerage Section I, Kuriyathy Work started.
36 KLM SEW AMRUTH -TSS Rehabilitation – Urgent Re-Laying 200mm SW pipe and construction of manhole near Parthas at Power House Road Work in progress
37 KLM SEW AMRUTH – TSS Rehabilitation – Relaying chocked and broken sewer line including construction of man holes from SNRA 88B to SNRA 101 at SN Nager, Pettah and  and reconstruction of dilapidated man holes at Ambalathumukku Kaumudhi Residents Lane Work completed. Bill under process.
38 KLM SEW AMRUTH -TSS Rehabilitation – Increasing the size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar I Reach Ch.0 M to 379m Work in progress
39 KLM SEW AMRUTH -TSS Rehabilitation -Increasing in size of existing sewer main using 400mm dia RCC NP3 pipe from Edappazhinji towards CSM Nagar II Reach Ch.379M to 817m Work in progress
40 KLM SEW AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Lenin Nagar Agreement executed & work started
41 KLM SEW AMRUTH -TSS Rehabilitation – Dismantling existing damaged 100mm dia Sw sewer line and laying 200mm dia SW pipe and construction of manholes at Madathuvila Lane Edappazhinji Agreement executed & work started
42 KLM SEW TSS – AMRUTH -Rehabilitation — Dismantling of damaged brick manhole and re-constructing with RCC manhole at Attara lane, Kannammoola under Sewerage Section Sasthamangalam        Agreement executed & work started
43 KLM SEW AMRUTH – TSS Rehabilitation- Urgent rehabilitation works on the sewerage system at Kadakamthalackal lane, Melaranoor  Work completed. Bill under process.
44 KLM SEW Tss- E Block Zone II – Laying 700mm dia  sewer main from Jagathy towards common manhole at Vivekananda Nagar Ist Reach ch 0m to 259m Work order issued & Agreement executed. Pipe supplied. (2 works clubbed)
45 KLM SEW Tss- E Block Zone II – Laying 700mm dia sewer main from Jagathy towards common manhole at Vivekananda Nagar IInd Reach ch 259m to 512m Work order issued & Agreement executed. Pipe supplied. (2 works clubbed)
46 KLM SEW TSS- E Block Zone III – Supplying and laying 150 mm dia SW  branch sewer line from the existing MH towards Melekuzhivila at Maruthamkuzhy Work cannot proceed.
47 KLM SEW Construction of Pumping station at Akkulam ( Block K) Work order issued on 11.1.2019 & Agreement executed
48 KLM SEW Supplying and laying 450mm DI K9 pumping main for a length of 1800m (Block K Akkulam pumping station to Pulayanarkotta stilling chamber) Work completed. Bill under process.
49 KLM SEW Construction of Pumping station at Karimanal ( Block J) Work started.
50 KLM SEW Laying Transmission main and sewer networks in Block J (Karimanal) collection and conveyance system.                                                             (A) Trunk main to Karimanal Part works (2 nos) retendered.
51 KLM SEW AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-82 to 92- under Sewerage Section,Sasthamangalam Work completed. Bill under process.
52 KLM SEW AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line B-7- under Sewerage Section,Sasthamangalam Work completed. Bill under process.
53 KLM SEW AMRUT SAAP -2017-18 -TSS- Dismantling existing 100 mm dia SW pipe and relaying 200 mm SW sewer line and construction of RCC Man hohes at T N line , Vazhuthacaud under Sewerage Section,Sasthamangalam Work completed. Bill under process.
54 KLM SEW AMRUT SAAP-2017-18- TSS- Supplying & Laying sewer line  at Street – 3 of Devaswom Board Residents Association Area Work completed. Bill under process.
55 KLM SEW AMRUT SAAP  2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Right R C area under Sewerage section , Sasthamangalam Work completed. Bill under process.
56 KLM SEW AMRUT SAAP  2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Central R C area under Sewerage section , Sasthamangalam Work completed. Bill under process.
57 KLM SEW AMRUT SAAP  2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in Left R C area under Sewerage section , Sasthamangalam Work completed. Bill under process.
58 KLM SEW TSS – Reconstruction of dilapidated manholes in Palkulangara, Pettah, Perunthanni area under Sewerage Sn 1 Work in progress
59 KLM SEW TSS – Reconstruction of dilapidated manholes in Manacaud, Sreevaraham, Kalippankulam, Enchakkal area under Sewerage Sn 1 Work in progress
60 KLM SEW TSS – Reconstruction of dilapidated manholes in Chalai, Fort, Chenthitta, Attukal, Pazhavangadi, Powerhouse area under Sewerage Sn 1 Work in progress
61 KLM SEW TSS – Reconstruction of dilapidated manholes in Vanchiyoor, Pulimoodu, chirakulam, Uppidamoodu, Pallimukku area under Sewerage Sn 1 Work in progress
62 KLM SEW TSS- Rehabiliatation of sewer line from Pettah to Railway hospital road  
63 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Thakaraparambu, sreekanteswaram Manacaud Aiswarya Nagar Area Work started.
64 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Enchakkal area Work started.
65 KLM SEW TSS – Reconstruction of dilapidated manholes in Arannoor, Thycaud area under Sewerage Sn 2 Work in progress
66 KLM SEW TSS – Reconstruction of dilapidated manholes in Karamana Thaliyal area under Sewerage Sn 2 Work in progress
67 KLM SEW TSS – Reconstruction of dilapidated manholes in Poojapura, Mudavanmugal area under Sewerage Sn 2 Work in progress
68 KLM SEW AMRUT SAAP -2017-18-TSS Rehabilitation and up gradation of Existing sewer network at Karamana Sathya Nagar Branch lanes of Sreedevi Nagar under Sewerage Section No.2, Kuriathy  Work in progress
69 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Jagathy kavuvila, Karyakar lane,  Valiyasala kavil temple, Arysala Vivekananda street, Vilayil lane, Erakkam road Work Order Issued & Agreement executed. Work in progress.
70 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network and interconnections at Valiyasala myladikadavu, Jagathy near sunny pharma, CIT road Work Order Issued & Agreement executed. Work in progress.
71 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Kala vihar, Kunnukuzhy Agreement executed and work started.
72 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Pattom Vrindavan gardens Work completed. Bill under process.
73 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Thittakudi temple lane, Vadakkekottah, Puthunagar area  Work in progress. Pipe supply on going.
74 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Kunninpuram, vivekananda nagar, Kailas nagar, NM nagar area Work in progress. Pipe supply on going.
75 KLM SEW TSS-Rehabilitation and upgradation of existing sewer network at Punnen road near secratariat and Mele Thampanoor area Work in progress.
76 KLM SEW TSS- Rehabiliatation of sewer line at Melemankattukonam in Nedumcad ward Work completed. Bill under process.
77 KLM SEW TSS- Rehabiliatation of sewer line at Thoppil lane, Valiyasala, Sasthri nagar West, cherukodu, Thelungu chetti theruvu area Agreement executed
78 KLM SEW Providing Sewerage facility to newly constructed residential colony at Karimadom – Part ll Work in progress
79 ALP WS 28.00LL OHSR at Valiyakulam(Zone-VII – Alliserry) We raised this issue in last 4 core committees and  last 2 review meetings.
80 ALP WS 10.00LL OHSR at Pazhavangadi(Zone-VI) Nearing completion
81 ALP WS 21 LL OHSR at Kommadi(Zone-1) shuttering forthird levelcolumn work in progress.
82 ALP WS 12.00 LL Capacity OHSR at Thathamppally shuttering for second level brace work in progress.
83 ALP WS Augmentation and modernisation of Watersupply distribution system in Alappuzha Municipality 2nd phase Out of 126Km, 53.5 Kmpipe laid.
 Work temporarily stopped due to high water table and monsoon.
84 ALP WS Augmentation and modernisation of Watersupply distribution system in Alappuzha Municipality PhaseIII Out of 189Km, 83 Kmpipe laid.
 House connection work M.S work, Hydro testing progressing.
85 ALP      
86 ALP Sector Name of Work Remarks
87 ALP WS Construction Of 40 LL capacity OHSR at Kaloor  
88 ALP WS Replacement of 5000 damaged serviced water connections  
89 ALP WS Construction of 15LL OHSR and 2 LL  CWR at Vadathode, Cheranalloor. work started piling 35/35 completed, pile vertical load testing completed
90 ALP WS Construction of 10LL  OHSR at Thevara. Piling and vertical load test completed.pile chipping completed, grade beam completed. Column, beams & slabs,  completed. Floor beam&floor slab completed, side wall completed, roof slab completed
91 ALP WS Construction of  13LL capacity OHSR at Edakochi   Site clearance,soil investigation completed
92 ALP WS Replacement of existing 525mm distribution cum pumping main with 600mm rider main from Karuvelippady to Koovappadam in Kochi Corporation.  1520m Pipe supplied. Road cutting permission obtained for 887m.Laying work started.Balance amount of Rs.47.71 lakhs remitted to PWD on 28/02/2019. 401m pipe laying completed.
93 ALP WS Replacement of 100mm CI pipe by laying 160mm and 110mm PVC Class 5 along both side of pipes from Valanjambalam to Ravipuram in Kochi Corporation 16-17 Pipe supply completed. Laying of 722.00 m (110 mm) &  713.80m (160 mm) PVC pipe completed. Inter connection at SA road completed.22/20 of service connection done. 14/13 of bye lane connection done.work completed. Final bill to be submitted from KWA
94 ALP WS Laying pumping main of 500mm DI pipe from JnNURM WTP at Maradu to Pumphouse at Thammanam for additional pumping of water (upto 18mld) to Kochi city in Kochi Corporation 16-17. PWD sanction received. NHAI and NH PWD permission pending – Joint site visit with NHAI KWA PWD completed and permission from NHAI pending. Permission for laying of pipe at Kundannoor flyover portion and Vyttilla  flyover portion will be received only after construction of respective flyovers.                 
95 ALP WS Laying rider main from Kathrikadavu to Elamkulam, Chettichira, Ponnurunni areas and distribution lines in Chakkaraparambu, Chalikkavattom areas in Kochi Corporation 2016-17. GCDA permission is required to complete the work (18m).  Estimate of road restoration  not yet recived from GCDA. GCDA demands settlement of 66 Lakh +GST+Interest to GCDA by KWA .  Chief Engineer’s intervention with GCDA Chairman was not fruitfull.
96 ALP WS Water supply sector – Kochi Corporation – Laying 500mm DI line from  Pump house at Thammanam to OHSR at Kadavanthara. PWD permission received. GCDA permission is required to completed the work (108m).  Estimate of road restoration is not yet get from GCDA demand settlement of 66 Lakh +GST+Interest to GCDA.  Chief Engineer’s intervention with GCDA Chairman was not fruitfull.                           
97 ALP WS Laying of 500mm transmission line form Kathrikadavu to proposed Pachalam CWR. GCDA permission is required to completed the work (110m).  
98 ALP WS Laying 400mm DI K9 pipe line from Perumanoor To Ravipuram for a length of 1270m  
99 ALP TCR    
100 ALP Sector Name of Work  
101 ALP WS AMRUT-Survey and replacining of faultymeters and pipe lines and providing new water connections in Thrissur Corporation area    
102 ALP WS AMRUT-2015-16 Completion of ongoing Schemes –UWSS TO Ollur&Edakkunni Census Town Villages in Thrissur Corporation –Construction of 20LL Capacity OHSR at Ollur& Supplying, Laying Distribution lines and construction of retaining wall at WTP,Arattupuzha.  
103 ALP WS Rehabiliation of Thrisur Corporation water  scheme to koorkenchery zone –Supply and Laying for separate Branched gravity main of 400mm D1K9 and replacement o700mm premowit h 700mm D1K9 pipe and supply erection and commissioning of 65lHP centrifugal motor pump set for replacing of existing old pumpsets-2 nos at koorkenchery sump alied works  
104 ALP WS Strengthening the existing distribution system to Thrissur corporation area – Replacement of very old 80/100/125/300 mm AC &700mm premo pipes with 110/140 mm PVC and 200/300/350 mm D1 pipes at various places in Thrissur Corporation-Phase-1  
105 ALP WS Strengthening the existing distribution system to Thrissur corporation area – Replacement of very old 80/100/125/300 mm AC &700mm premo pipes with 110/140 mm PVC and 200/300/350 mm D1 pipes at various places in Thrissur Corporation-Phase-2  
106 ALP WS AMRUT – Zoning and mapping of water supply system of Thrissur Corporation – Supply and laying of various dia pipes – Part I  
107 ALP WS AMRUT – Zoning and mapping of water supply system of Thrissur Corporation – Supply and laying of various dia pipes – Part 2  
108 ALP WS Laying of distribution lines from existing OHT at Kizhakumpattukara to Nellikunnu area for around 15 km with varing dia pipelines-(Dia 200 mm DI to 110 mm PVC  
109 ALP WS Instalation of generator at Peechi and dedicated power feeder line from 33KV substation Pattikkad to Peechi treatment plant  
110 ALP WS Construction of 10 LL OHSR at  Anappara with Pumping system and pumping main from Cherur to Anappara- Improvement of water supply system in Div 6.7 and 8 of Thrissur corporation Part-1  
111 ALP WS Construction of 10 LL OHSR at  Anappara with Pumping system and pumping main from Cherur to Anappara- Improvement of water supply system in Div 6.7 and 8 of Thrissur corporation Part-2  
112 ALP WS Construction of new 20 MLD WTP at Peechi Thrissur Corporation-Phase-1  
113 ALP WS Construction of new 20 MLD WTP at Peechi Thrissur Corporation-Phase-2  
114 ALP WS Construction of 5LL OHSR at Kuttanelloor with pumping system at Kuriyachira and pumping main for 4KM with 200 mm DI and 5KM distribution line  
115 ALP WS Floating Intake Structure at Peechi Reservoir  
116 ALP WS Renovation of existing damaged pump house in Thrissur Corporation  
117 PKD WS Providing new pumping main 600mm DI-K9 – 3400m from
Puthur Jn. to Moothanthara
 
118 PKD WS Providing new pumping main 450mm DI-K9 – 4650m from
Mattumantha to Kalmandapam
 
119 PKD WS New pumping main-From Malampuzha WTP to Mattumantha DI- K9 pipe 600 mm – 2850 m PWD Road cutting NOC is pending
120 PKD WS Construction of 16L LLtrs OHSR at Kalmandapam KWA and demolishing the existing OHSR. PWD Road cutting NOC is pending
121 PKD WS Construction of 45 MLD water treatment plant at  Malampuzha, KWA compound and booster station. PWD Road cutting NOC is pending
122 PKD WS Constuction of OHSR 2 Nos, total 76. ji5LL capacity  PWD Road cutting NOC is pending
123 PKD WS Providing Rider main pipe lines for proper zoning (500/450/400/350 mm DI(From 3 zonal OHSRs)) –15 Km PWD Road cutting NOC is pending
124 PKD WS Providing 160mm PVC – 30 Km for taking Water Service Connection (Both sides of road) and changing of connections PWD Road cutting NOC is pending
125 PKD WS Providing 160mm PVC – 38 Km for taking Water Service Connection (Both sides of road) PWD Road cutting NOC is pending
126 PKD WS Replacement of Existing AC pipe lines to DI/PVC pipe lines 150/200/250mm DI-K9 – 6 km PWD Road cutting NOC is pending
127 PKD WS Providing water connections to all to eliminate public taps and to reduce NRW 9000Nos PWD Road cutting NOC is pending
128 KOZ   Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation   :  Package I  
129 KOZ   Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation  :  Package II  
130 KOZ   Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation  :  Package IV  
131 KOZ   Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation  :  Package V  
132 KOZ   Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation  :  Package VIII Pipe supplied
133 KOZ   Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II).  :  Package III  
134 KOZ   Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II).  :  Package IV  
135 KOZ   Strengthening of existing infrastructure facilities, and quality improvement of CWSS  :  Package I Advance payment.Agreement executed on 08/03/2019
136 KOZ   Strengthening of existing infrastructure facilities, and quality improvement of CWSS  :  Package II  
137 KOZ   Strengthening of existing infrastructure facilities, and quality improvement of CWSS  :  Package II Electrical   Placed order for pumps
138 KOZ WS Integrated Calicut WSP phase 2 -Laying distribution Lines in 10 zones  
139 KOZ   Beypur zone  
140 KOZ   Pottammal zone  
141 KOZ   Eravathkunnu south zone  
142 KOZ   Balamandiram zone   
143 KOZ   East Hill Zone  
144 KOZ   Elathur Zone Pipe supply order placed
145 KOZ   Eravathukunnu (North) Zone  
146 KOZ   Malaparamba Zone  
147 KOZ   Cheruvannur Zone  
148 KOZ   Kovoor Zone  
149 KNR WS Laying Gravity Main From JICA project at Mangattuparamba to pallikkunnu OHSR for pallikunnu and villages in Kannur taluk of Kannur Corporation  
150 KNR WS Construction of 24LL Capacity OHSR at Pallikunnu for Pallikunnu & Puzhathi villages in Kannur Corporation  
151 KNR WS Construction of 14LL Capacity OHSR Thottada at Edakkad Zone 3 in Kannur Corporation Only Painting work remaining. 
152 KNR WS Rehabilitation of existing old network, valves, house service connection and inter-connections with existing lines including road reformation charges – Puzhathi  
153 KNR WS Laying Conveyance main/Pumping main from Melechovva to OHSR at Edakkad including supply Erection of Pumpsets Pump house- finishing work in progress. Gravity trial run in progress
154 KNR WS Enhancing Capacity of Treatment plant  from 30.00 MLD to 40.00 MLD including modernisation of existing treatment  plant   
155 KNR WS Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges – Pallikunnu  
156 KNR WS Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges – Elayavoor  
157 KNR WS Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges – Edakkad  
158 KNR WS Laying new distribution line and providing new service connections at Edakkad Zone