AMRUT – Completed Projects

Details of Completed Works  as on 17.Jan.2020 

  KWA ULB Grand Total
ULB WS SEW Total SWD UT PARKS Total
TVM 12 38 50 69 1 1 71 121
KLM 7 0 7 3 1 4 8 15
ALP 1 0 1 56 4 1 61 62
KOC 4 0 4 31 3 1 35 39
TCR 2 0 2 39 2 2 43 45
GUV 0 0 0 10 0 0 10 10
PKD 0 0 0 36 4 5 45 45
KOZ 7 0 7 0 0 0 0 7
KNR 3 0 3 0 0 0 0 3
Grand Total 36 38 74 244 13 14 273 347

 

ULB PROJECTS – 273 Nos 

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Thazhathparamb temple thodu at Palace Ward 0.24 6months 5/10/2018 mitigation of water logging
2 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Koikkaramparambu thodu at Palace Ward 0.13 6months 31-05-2018 mitigation of water logging
3 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Drain Joining Kottaram thodu-Vadasserry at Palace Ward 0.4 6months 28-09-2018 mitigation of water logging
4 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – SNDP Thodu at Palace Ward 0.41 6months 12/3/2018 mitigation of water logging
5 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Valappil thodu at Zilla Court Ward 0.08 6months 11/3/2018 mitigation of water logging
6 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Kaniyaparambu Thodu at Thathampally Ward 0.28 6months 28-09-2018 mitigation of water logging
7 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – karukapparambu 0.08 6months 31-05-2018 mitigation of water logging
8 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kadarveli thodu 0.24 6months 29-08-2018 mitigation of water logging
9 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kottamkulangara reach i 0.38 6months 19-12-2018 mitigation of water logging
10 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kottamkulangara reach iii 0.43 6months 12/11/2018 mitigation of water logging
11 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 01 0.09 6months 25-11-2018 mitigation of water logging
12 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 02 0.33 6months 10/10/2018 mitigation of water logging
13 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 03 0.46 6months 23-11-2018 mitigation of water logging
14 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near Karuveli Puthenpurackal road culvert in Thondankulangara ward. 0.12 6months 14-09-2018 mitigation of water logging
15 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain Near Vanakkumasa Church 0.18 6months 25-11-2018 mitigation of water logging
16 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Near Indira Jn West road culvert 0.12 6months 14-09-2018 mitigation of water logging
17 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Various drains in Mullathvalapp Ward 0.43 6months 22-01-2019 mitigation of water logging
18 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Ayyamparambu thodu 0.4 6months 31-01-2019 mitigation of water logging
19 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – drain near cd pappachan 0.05 6months 25-01-2019 mitigation of water logging
20 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Devi nagar 0.07 6months 13-02-2019 mitigation of water logging
21 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Matsyagandhi 0.24 6months 26-02-2019 mitigation of water logging
22 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Kottamkulangara Reach 4 0.23 6months 23-02-2019 mitigation of water logging
23 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Chanda thodu to SN Kalasamithi 0.36 6months 2/6/2019 mitigation of water logging
24 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain back of Smashanam to Illickal Road 0.23 6months 2/6/2019 mitigation of water logging
25 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Old NSS Karayogam thodu 0.05 6months 12/3/2019 mitigation of water logging
26 ALP UT Alappuzha Municipality- SAAP I – Pedestrian Network at Indira Jn 0.19 6months 12/10/2018 Improved Pedestrian safety
27 ALP UT Alappuzha Municipality- SAAP III – pedestrian Network at jain temple road 0.06 6months 2/6/2019 Improved Pedestrian safety
28 ALP Parks General hospital park 0.07 6months 19-11-2018 Green space development
29 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Iravukadu – Kochu Rani Drain 0.26 6months 22-07-2019 mitigation of water logging
30 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM BYEPASS TO VATTAYAL ROAD 0.36 6months 14-06-2019 mitigation of water logging
31 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Near Malgar Bridge 0.16 6months 19-04-2019 mitigation of water logging
32 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain joining Rani Canal 0.04 6months 24-07-2019 mitigation of water logging
33 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Drain Joining Ayyappan Pozhi near community hall at Railway Station Ward 0.21 6months 9/4/2019 mitigation of water logging
34 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Malikakkalchira 0.08 6months 9/4/2019 mitigation of water logging
35 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM ARYAMPARAMBU CULVERT TO ST. JOSEPH KURISHADY 0.45 6months 3/4/2019 mitigation of water logging
36 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM REFORMING VAYANASHALA TO ST. JOSEPH KURISHADY 0.41 6months 21-01-2019 mitigation of water logging
37 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – POONTHOPPU ROAD TO AS CANAL ROAD 0.35 6months 2/4/2019 mitigation of water logging
38 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Vayalar Area 0.22 6months 13-06-2019 mitigation of water logging
39 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near Vallamparambil 0.06 6months 18-06-2019 mitigation of water logging
40 ALP UT Alappuzha Municipality- SAAP I – Pedestrian Network at Thumpoly Church 0.12 6months 3/4/2019 Improved Pedestrian safety
41 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Parusseri thodu 0.41 6months 22-07-2019 mitigation of water logging
42 ALP UT Alappuzha Municipality- SAAP II – Pedestrian Network at A.N Puram 0.17 6months 22-08-2019 Improved Pedestrian safety
43 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Valiyamaram HB padam 0.03 6months 22-08-2019 mitigation of water logging
44 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Drain Near Anganavadi 129 to Thalavady temple road -Kottamkulangara Reach 02 0.28 6months 27-07-2019 mitigation of water logging
45 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Papanagar-2 0.23 6months 18-07-2019 mitigation of water logging
46 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near to malikka mukka 0.12 6months 17-07-2019 mitigation of water logging
47 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Municipal Stadium – Chirayil Drain 0.08 6months 27-07-2019 mitigation of water logging
48 ALP SWD Starting point to Shornur Canal road 0.2 6months 3/5/2019 mitigation of water logging
49 ALP SWD Pallikkandath to Methassery at Zilla Court Ward 0.33 6months 27-07-2019 mitigation of water logging
50 ALP SWD Holy Family school to Chemmoth road 0.14 6months 2/9/2019 mitigation of water logging
51 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DrainNear Mangalam road culvert 0.25 6months 23-04-2019 mitigation of water logging
52 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DrainNearKalarcode to Yakthi House 0.3 6months 27-05-2019 mitigation of water logging
53 ALP SWD Malikayil Thodu at Zilla Court Ward 0.34 6months 16-10-2019 mitigation of water logging
54 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Mammood Road To Poonthoppu Road 0.45 6months 3/10/2019 mitigation of water logging
55 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Ouseph House to Thadickel Vadakke Veedu 0.11 6months 3/10/2019 mitigation of water logging
56 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III – DrainNear Mangalam road culvert 0.25 6months 23-04-2019 mitigation of water logging
57 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III – DrainNearKalarcode to Yakthi House 0.3 6months 27-05-2019 mitigation of water logging
58 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP I-Malikayil Thodu at Zilla Court Ward 0.34 6months 16-10-2019 mitigation of water logging
59 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Mammood Road To Poonthoppu Road 0.45 6months 3/10/2019 mitigation of water logging
60 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Ouseph House to Thadickel Vadakke Veedu 0.11 6months 3/10/2019 mitigation of water logging
61     Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Thadickel Vadakke Veedu to Thundu Thadickel House near Kalath road 0.29 6months 31-12-19 mitigation of water logging
62 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 A 0.33 22-05-2018 3/8/2019 100
63 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 E 0.12 6 24-12-2018 Coverage of drains increased. 2 water logging points eliminated
64 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 F 0.1 6 0.3.12.2018 Coverage of drains increased. 3 water logging points eliminated
65 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 B 0.15 6 22.12.2018 Coverage of drains increased. 3 water logging points eliminated
66 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 C 0.142 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
67 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 D 0.145 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
68 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 E 0.053 6 22.02.2019 2 Water logging points eliminated
69 GUV SWD SAAP 2016-17 Package II – Covering and repair of minor drains in 16 different locations of the municipal area- Phase II 0.14 6 21-03-2019 4 Water logging points eliminated
70 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – ID 0.11 6 29-03-2019 3 Water logging points eliminated
71 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – IC 0.11 6 5/5/2019 3 Water logging points eliminated
72 KLM SWD Uliakovil-Ashtamudi Drain-Phase I 0.41 2 28-01-2017 100%-Drainage system improved
73 KLM SWD Uliakovil Area Phase3 0.14 8 23-12-2018 100%-Drainage system improved
74 KLM SWD Mundakkal 0.2 8 30-06-2019 100%-Drainage system improved
75 KLM Parks Improvement of Parks-phase 1(TK Divakaran Park , Nehru Park) 0.272 5 28-01-2017 100%-Park status improved
76 KLM Parks Corporation Park 0.4 12 30-06-2019 100%-Park status improved
77 KLM Parks Kambiyilkulam 0.27 12 30-06-2019 100%-Park status improved
78 KLM Parks Asraamom 1.0615 11 7/11/2019 100%-Park status improved
79 KLM UT Footpath from AR Camp to Railway Station Road-Phase I 0.33 12 15-11-2017 100%-Drainage system and the pedestrian traffic improved
80 KOC SWD Renovation of drains along Kannanthodathu road, Tricovil road 0.22 3months 9/4/2018 100%
81 KOC SWD Drain from Lisie jn. To Kottekanal 0.48 5 months 11/4/2018 100%
82 KOC SWD New drain along Kochakko road Athiparambu road and Masjid road -div- 45 0.55 5 months 13-11-2018 100%
83 KOC SWD Drain from Chilavannur road to Chilavannur river 0.39 5 months 26-11-2018 100%
84 KOC SWD Construction of drain along Kaloor -Kathrikadavu road (old) 0.74 6 months 12/5/2018 100%
85 KOC SWD Drain near Thrithwam 0.39 4 months 12/5/2018 100%
86 KOC SWD Renovation of Palarivattam Thammanam Thodu 1.24 1 year 17-12-2018 100%
87 KOC SWD Drain repair along Chennankulangara road at Edappally 0.26 6 months 13-01-2019 100%
88 KOC SWD Kizhavana road east drain 0.09 6 months 6/3/2019 100%
89 KOC SWD Drain from North over Bridge to Lissie 0.64 6 months 2/2/2019 100%
90 KOC SWD Construction of drain along St. Vincent road  0.61 6 months 15-02-2019 100%
91 KOC SWD Cover Slab above Parayapilly Thodu Near Amrutha Hospital -Kunnampuram 0.387 6 months 26-03-2019 100%
92 KOC SWD Joys Thodu, boundary Thodu & athirthy Thodu 0.428 6 months 31-03-2019 100%
93 KOC SWD Renovation of Binni Thodu div-13 0.496 6 months 15-06-2019 100%
94 KOC SWD Renovation of drain along TKC road 0.297 4 months 7/6/2019 100%
95 KOC SWD Side protection of Thuruthelchal Thodu Chakkaraparamba 0.175 4 months 25-06-2019 100%
96 KOC SWD Drain along SRM road at Pachalam 0.11 3 months 1/7/2019 100%
97 KOC SWD Puthukalavattom Elamakara drain repair 0.5 5 months 17-08-2019 100%
98 KOC SWD Construction of drainage at Mattanchery Synagog, Mattanchery palace and Mattanchery boat jetty 1.29 8 months 28-05-2019 100%
99 KOC SWD Renovation of drains at VAT junction, Kanosa nagar, Illiparambu 0.253 6 months 30-08-2019 100%
100 KOC SWD Rejuvenation of drains from Kappalandi Mukku to Panayappilly in Jew town 0.182 7 months 30-08-2019 100%
101 KOC SWD Renovation of Peruvelithodu, Karuppally thodu & Punathil Padam thodu 1.079 6 months 30-08-2019 100%
102 KOC SWD Pallichal canal 0.575 6 months 18-12-2018 100%
103 KOC SWD Renovation  of Vivekananda Thodu from South railway station to Mullassery canal 0.832 6 months 26-06-2019 100%
104 KOC SWD Drain from Waterland to Chirakkal puzha – Pullardesham & Chirakkal puzha 0.343 6 months 29-06-2019 100%
105 KOC SWD Desilting Managalavanam Thodu 0.198 4 months 22.09.2019 100%
106 KOC SWD Rejuvenation of Mantra canal 1.027 6 months 30/08/2019 100%
107 KOC SWD Rejuvenation of  Kanichat Thodu 0.29 9 months 12/11/2018 100%
108 KOC SWD Rejuvenation of sub drains of Perandoor canal at Pottakuzhy 0.158 3 months 30/07/2019 100%
109 KOC SWD Rail Nagar Thodu 1.73 9 months 12/11/2018 100%
110 KOC SWD Rejuvanation of PashniThodu 1.990 5 months 28/11/2019 100%
111 KOC Park Renovation of St. John Park 0.36 9 months 18/7/2019 100%
112 KOC UT Construction of Foot Path  from Jose junction to Atlantis at MG Road 1.73 9 months 4/6/2018 100%
113 KOC UT Foot path from Atlantis junction to Thevara Junction at MG Road 1.7 9 months 18-07-2019 100%
114 KOC UT Foot path from line Jn to Samskara Jn. at Palarivattom 0.403 5 months 29-03-2019 100%
115 TCR SWD SWD-Phase-1- WORK-2-Netaji Rd- Mother land Rd 0.71 5 9/11/2018 100%
116 TCR SWD SWD-Phase-1-WORK-3-Shanthi Rd 0.49 4 26-12-2018 100%
117 TCR SWD SWD-Phase-1-WORK-12-South Pentark-Elite hospital 0.55 5 20-10-2018 100%
118 TCR SWD SWD-Phase-2-work-46 pc thomas rd 0.67 5 6/8/2018 100%
119 TCR SWD SWD-Phase-3-ND BRIDGE -JAVAHAR WORK 72 0.3 4 9/11/2018 100%
120 TCR SWD SWD-Phase-3-Div 50 WORK 77 0.1 3 4/9/2018 100%
121 TCR SWD SWD Phase 1(Div 28. C V Kochunni road)work 1 0.3 4 10/10/2018 100%
122 TCR SWD SWD Phase 3(Div 25,Nehru Church -Thiruthur Temple Road ) Work 73 0.68 5 30-03-2018 100%
123 TCR SWD SWD Phase1(Div 28. Puthanangadi Road) Work 4 0.24 3 27-11-2018 100%
124 TCR SWD SWD Phase 1 (Div 20. Shastri Lane Part 1,Div 20. Shastri Lane Part 2)Work 7 0.42 4 31-03-2018 100%
125 TCR SWD SWD Phase 1 (Div 34. Metropolitan Hospital-Baliya Thodu, Work 11 0.47 4 15-11-2018 100%
126 TCR SWD SWD Phase 1 (Div 34. POST OFFICE – BALIYA THODU) Work 13 0.44 4 3/10/2018 100%
127 TCR SWD SWD(DIV 1, )Ramnagar Rd-1,2,3,4Work 27 0.68 5 26-11-2018 100%
128 TCR SWD SWD-Phase 2 (Div 1 Jayaprokash Road) Work 32 0.16 3 4/9/2018 100%
129 TCR SWD SWD Phase 2 (Div 23,Unity Road Part 1 & 2 )Work 48 0.24 4 27-09-2018 100%
130 TCR SWD SWD Phase 3(Div 52,West fort Achuthamenon Road-2 )Work 86 0.54 5 9/8/2018 100%
131 TCR SWD SWD Phase 2 (Div 1,Jayaprakash Lane)Work 33 0.07 5 25-09-2018 100%
132 TCR SWD SWD Phase 1(Div 34. Shakthan nagar) Work 15 0.96 5 15-12-2019 100%
133 TCR SWD SWD Phase 3(Div 51,Thopilmoola-Kalvari )Work 75 0.44 4 28-09-2018 100%
134 TCR SWD SWD Phase 1( DIV 34. Thankamani Bus Stop)Work 16 0.28 3 24-10-2018 100%
135 TCR SWD SWD Phase 2 (Div 4,Viyyur Pandikkavu-Peringavu Canal )Work 40 0.29 4 22-12-2018 100%
136 TCR SWD SWD Phase 2 (Div 9,Kuttumukku Road )Work 42 0.14 3 15-02-2019 100%
137 TCR SWD SWD Phase1 (Div 34. Post Office , LIC Junction) Work 14 0.67 5 9/11/2018 100%
138 TCR SWD SWD Phase 2 (Div 23,Pallikkulam Road )Work 47 0.1 3 31-07-2018 100%
139 TCR SWD SWD Phase 3(Div 36,A R menon Road )Work 82 0.3 4 26-09-2018 100%
140 TCR SWD SWD Phase 1(Div 33 Pattala Kinar Road)Work 10 0.59 5 2/4/2019 100%
141 TCR SWD SWD- Div 01, Seetharamaswami Temple Road, (Work 28 ) 0.71 5 25-10-2018 100%
142 TCR SWD SWD Phase 3(Div 7,Mannumukkodu Vimala College-Cherutta) Work 69 0.43 4 31-03-2019 100%
143 TCR SWD SWD Phase 3(Div 9,Kuttumukku Road )Work 70 0.4 4 29-12-2018 100%
144 TCR SWD SWD Phase 2 (Div 20, Jesus Lane Road ,Alukka Angadi Road ,Nazerth Angadi Road )Work 44 0.97 5 31-03-2019 100%
145 TCR SWD -SWD Phase 2  Udayanagar NO9 Drain Work 31  0.21 4 10/12/2018 100%
146 TCR SWD SWD Phase 2 (Div 23,Thottathil Lane )Work 50 0.07 3 10/4/2019 100%
147 TCR UT Urban Transport Phase 3(Div 23- Unity road 1 and Unity road 2)Work 59 0.09 3 3/11/2019 100%
148 TCR Parks Rejuvenation of Nehru park in Thrissur Corporation Phase I 0.91 5 3/12/2018 100%
149 TCR SWD SWD Phase 1 -( Div 28. Ancheri – Perivankulangara road – 1,2,3 + Netaji road – Motherland road – 2,3 + Kundolipadam road)Work 5 0.97 5 11/5/2018 100
150 TCR SWD SWD Phase 2 (Div 23,Thottanpetta Road )Work 52 0.04 3 4/10/2019 100
151 TCR Parks Rennovation of Nehru park Phase 2 0.69 4 28-03-2019 100
152 TCR SWD SWD Phase1 (Div 33. Pattala Kinnar Road,ST. Joseph Model School)Work 8 0.8 5 26-03-2019 100
153 TCR SWD SWD  Phase 3(Div 36,Marar Road )Work 83 0.14 4 28-02-2019 100
154 TCR SWD SWD  Phase 3(Div 36,Machingal lane Road )Work 84 0.17 4 19-01-2019 100
155 TCR SWD Storm Water Drainage-  Phase 2 (Div 4,Viyyur Aduthodu )Work 36 0.17 4 19-01-2019 100
156 TCR SWD Storm Water Drainage Phase 2 (Div 23,Thoppe Stadium Ground Road )Work 51 0.05 3 13/2/2019 100
157 TCR UT Urban Transport  Div 1, Seetharamaswami Temple, Footpath(Work 23) 0.45 4 24-06-2019 100
158 TVM SWD Construction of drain in Asan Nagar  road in Muttathara Ward   0.0980 3 10/11/16 168m length of drain is completed. 
159 TVM SWD Construction of drain in Aalukadu-Moonattumukku  road in Manikyavilakom Ward   0.1581 3 05/11/16 275m length of drain is completed. 
160 TVM SWD Construction of drain in VKK Nagar road in Perunthanni  Ward   0.2616 8 30/06/17 447m length of drain is completed. 
161 TVM SWD Construction of drain in Naalumukku-Chambakkada  road in Sreekanteswaram  Ward   0.1918 6 27/02/17 350m length of drain is completed. 
162 TVM SWD Construction of drain in Swathi Nagar Lane road in Fort  Ward   0.2764 5 06/01/17 500m length of drain is completed. 
163 TVM SWD Construction of drain on Chattambi Swammi Nagar road in Perunthanni Ward   0.0750 3 20/04/18 107m length of drain is completed.
164 TVM SWD Construction of drain in Navodaya – Pazhanchira  road in Ambalathara Ward   0.2377 10 30/06/17 408m length of drain is completed. 
165 TVM SWD Construction of drain on Aryankuzhi road in Kamaleswaram Ward   0.3794 5 17/05/18 545m length of drain is completed. 
166 TVM SWD Construction of drain on Kulapparakkonam road in Mannanthala Ward   0.4197 6 29/05/18 600m length of drain is completed. 
167 TVM SWD Construction of drain on Aruvikkarakkonam – Santhipuram road in Njandoorkonam Ward   0.4531 4 26/03/18 647m length of drain is completed. 
168 TVM SWD Construction of drain near Old National Highway road in Sreekaryam Ward   0.4074 4 19/04/18 580m length of drain is completed.
169 TVM SWD Construction of drain on Peoples Lane road in Jagathy Ward   0.5553 7 06/06/18 793m length of drain is completed. 
170 TVM SWD Storm water drainage system for P D Nagar (from Vidya Gardens) in Vallakadavu ward 0.0957 2 23/10/18 173m length of drain is completed.
171 TVM SWD Construction of drain on Oruvakkonam – Kattayikkonam road in Kattaikonam Ward   0.5539 3 26/05/18 790m length of drain is completed. 
172 TVM SWD Storm water drainage system for Marappalam Gardens road in Muttada ward 0.3472 4 19/11/18 700m length of drain is completed. 
173 TVM SWD Construction of drain on Parayikkadavu Theruvila road in Mudavanmugal Ward   0.2115 6 11/08/18 300m length of drain is completed. 
174 TVM SWD Storm water drainage system for Thirumala Alapuram road in Thirumala ward 0.5593 4 02/11/18 997m length of drain is completed. 
175 TVM SWD Storm water drainage system for Priyadarshini Nagar in Vallakadavu ward 0.1364 2 12/09/18 242m length of drain is completed. 
176 TVM SWD Althara Temple Back side Road in Vazhuthacaud ward 0.0790 3 30/10/18 140m length of drain is completed. 
177 TVM SWD Thamburan Nagar area Road in Vazhuthacaud ward 0.1069 4 06/10/18 195m length of drain is completed.
178 TVM SWD Storm water drainage system for Bilal road in Vallakadavu ward 0.1195 2 26/10/18 192m length of drain is completed. 
179 TVM SWD Storm water drainage system for Valiyathura muttathara road in Vallakadavu ward 1.4209 4 08/11/18 882m length of drain is completed. 
180 TVM SWD Storm water drainage system for Golf link road in Kowdiar ward 0.2784 5 14/12/18 497m length of drain is completed. 
181 TVM SWD Storm water drainage system for Amman kovil kazhakootam market road in kazhakootam ward 0.2871 4 27/07/18 400m length of drain is completed. 
182 TVM SWD Storm water drainage system for Elangam Panayil road in Nedumcaud ward 0.0885 4 14/11/18 153m length of drain is completed. 
183 TVM SWD Storm water drainage system for Kesavadev road to Thrivikramangalam Thamalam Jn in Mudavanmugal ward 0.3442 5 03/01/19 656m length of drain is completed. 
184 TVM SWD Storm water drainage system for Chembaka Nagar area in Vazhuthacaud ward 0.3239 5 20/12/18 577m length of drain is completed. 
185 TVM SWD Construction of drain on Malamugal Kachani road in Kachani  Ward   0.5241 7 03/10/18 848m length of drain is completed. 
186 TVM SWD Construction of drain on Vazhathottam Kayalkara road in Poomkulam Ward   1.2325 8 08/01/19 1760m length of drain is completed. 
187 TVM SWD Construction of drain on Melemcodu road in Mannanthala Ward   0.5419 4 20/06/18 774m length of drain is completed.
188 TVM SWD Storm water drainage system for Jyothipuram railway bridge-Uijjaini Mahakali Amman Kovil road in Valiyasala ward 0.1905 3 30/11/18 319m length of drain is completed. 
189 TVM SWD Construction of drain on Thaliyal Thelungu Chetti Theruvu road in Karamana Ward 0.4845 7 07/01/19 619m length of drain is completed. 
190 TVM SWD  Storm water drainage system for Govt UPS to Sewage Farm in Beemapally ward 0.2884 4 29/12/18 508m length of drain is completed.
191 TVM SWD Construction of drain on Vattavilakam -Keraladithyapuram road in Chellamangalam Ward   0.5115 12 02/02/19 730m length of drain is completed.
192 TVM SWD  AMRUT – Storm water drainage system for Chitra Nagar road in Poojappura ward 0.1537 3 16/10/18 270m length of drain is completed.
193 TVM SWD Storm water drainage system for Kunnukuzhy-Kannamoola road in Kunnukuzhy ward 1.1676 7 22/02/19 1900m length of drain is completed. 
194 TVM SWD Storm water drainage system for Thanivilakam Lane Nemom in Ponnumangalam ward 0.0965 6 28/01/19 170m length of drain is completed.
195 TVM SWD Construction of drain on Cheenikkonam Maruvathoor   road in Nettayam  Ward   0.2130 12 01/02/19 305m length of drain is completed.
196 TVM SWD  Storm water drainage system for Shastri Nagar road / Mythodu Kuzhy (Right) in Mudavanmugal ward 0.5962 2 08/10/18 1180m length of drain is completed. 
197 TVM SWD Storm water drainage system for Kurattoor road in Mudavanmugal ward 0.0410 5 14/01/19 67m length of drain is completed.
198 TVM SWD Construction of drain on Ganga Nagar – Thrimoorthy Nagar road – KBS Line in Kamaleswaram Ward   0.6033 10 31/12/18 860m length of drain is completed.
199 TVM SWD Construction of drain on Thottam road in Ambalathara Ward   0.2884 12 18/02/19 412m length of drain is completed. 
200 TVM SWD AMRUT – Storm water drainage system for MLA Road near Thrivikramangalam -Thamalam in Mudavanmugal ward 1.2292 3 08/12/18 2300m length of drain is completed. 
201 TVM SWD 2018/11994 : AMRUT – Storm water drainage system for Thirumala-Mangad road in Thirumala ward 0.3996 4 27/02/19 714m length of drain is completed. 
202 TVM SWD Construction of drain on Mithra Nagar road in Ambalathara Ward 0.3846 6 16/11/18 549m length of drain is completed. 
203 TVM SWD 2018/11796 : AMRUT – Storm water drainage system for Keni road in Muttada ward 0.4750 4 08/04/19 678m length of drain is completed. 
204 TVM SWD 2018/11987 : AMRUT – Storm water drainage system for Arayalor road in Thirumala ward 0.5940 4 04/04/19 848m length of drain is completed.
205 TVM SWD Construction of drain on Manava Nagar road in Perunthanni Ward   0.2601 3 24/01/19 370m length of drain is completed. 
206 TVM SWD 2018/11337 : AMRUT – Storm water drainage system for towards Melemukku Mailadi Kadavu road in Valiyasala ward 0.6706 3 07/02/19 113m length of drain is completed.
207 TVM SWD 2018/11985 : AMRUT – Storm water drainage system for CSM Nagar road in Vazhuthacaud ward 0.4198 2 14/03/19 748m length of drain is completed. T
208 TVM SWD 2018/11996 : AMRUT – Storm water drainage system for Kesavan road in Poojappura ward 0.1615 3 17/05/19 230m length of drain is completed.
209 TVM SWD 2018/11781 : AMRUT – Storm water drainage system for N S Dippo road in Vallakadavu ward 0.1864 3 10/06/19 266m length of drain is completed. 
210 TVM SWD 2018/11666 : AMRUT – Storm water drainage system for Settlement Colony in Ponnumangalam ward 0.2540 3 11/04/19 362m length of drain is completed.
211 TVM SWD 2018/11305 : AMRUT – Storm water drainage system for Pulimoodu-Gandhari Amman Kovil road in Thampanoor ward 0.3037 3 02/06/19 430m length of drain is completed. 
212 TVM SWD 2018/11769 : AMRUT – Storm water drainage system for Milk Colony road in Bheemapally East ward 0.7597 4 27/07/19 1085m length of drain is completed. 
213 TVM SWD Construction of drain on Chenchery road in Mannanthala Ward   0.4830 4 26/04/19 638m length of drain is completed
214 TVM SWD 2018/11341 : AMRUT – Storm water drainage system for Quarters to Melarannoor LHS in Aranoor ward 0.3592 4 21/03/19 513m length of drain is completed. 
215 TVM SWD 2018/11336 : AMRUT – Storm water drainage system for Valiyasala DD Office-Santhikavadam Kochar road in Valiyasala ward 0.3160 3 15/05/19 450m length of drain is completed
216 TVM SWD 2018/11669 : AMRUT – Storm water drainage system for Old Karaykkamandapam Pottavila in Ponnumangalam ward 0.1300 3 05/08/19 185m length of drain is completed. The overall capacity of drain is 60m3 and is a covered drain. 75 Households are benefitted through this Project
217 TVM SWD Construction of drain on Kalluvila road in Chellamangalam Ward   0.3617 3 28/09/19 516m length of drain is completed.
218 TVM SWD 2018/11799 : AMRUT – Storm water drainage system for NCC Road in Chettivilakam ward 0.4622 4 20/06/19 660m length of drain is completed.
219 TVM SWD 2018/11304 : AMRUT – Storm water drainage system for Kanaka Nagar (Nanthankode to Vellayambalam) in Nanthancode ward 0.3344 3 30/04/19 477m length of drain is completed. 
220 TVM SWD 2018/12037 : AMRUT – Storm water drainage system for Kowdiar Tennis Club road in Kowdiar ward 0.7165 3 16/08/19 1023m length of drain is completed. 
221 TVM SWD 2018/11766 : AMRUT – Storm water drainage system for Vazhavila in Puthenpalli ward 0.1334 3 25/07/19 190m length of drain is completed. 
222 TVM UT Construction of foot path from Vazhuthacaud forest office jn to DPI along the left side of road Vazhuthacaud ward 0.0900 3 18/09/17 350m length Interlocking tiles laid
223 TVM Parks Construction and beautification of Thechanvila Park in Punnakkamugal ward 0.3000 6 26/05/17 Renovation of the pond including hand rails, Walk way, seating facilities etc was provided. The overall area of the park is 350 sqm
224 TVM SWD 2018/11292 : AMRUT – Storm water drainage system for Petta-Alimukku road in Kannammoola ward 0.1586 3 24/06/19 265m length of drain is completed. The overall capacity of drain is 90m3 and is a covered drain. 100 Households are benefitted through this Project
225 TVM SWD 2018/11293 : AMRUT – Storm water drainage system for RC Jn Thampuranmukku Moolavilakam road in Kannammoola ward 0.1453 4 05-07-19 237m length of drain is completed. The overall capacity of drain is 80m3 and is a covered drain. 90 Households are benefitted through this Project
226 TVM SWD 2018/10249 : AMRUT-Storm water drainage system for Kunnukuzhy colony in Kunnukuzhy ward 0.0895 4 20/05/19 145m length of drain is completed. The overall capacity of drain is 55m3 and is a covered drain. 60 Households are benefitted through this Project
227 TVM SWD 2018/11265 : AMRUT – Storm water drainage system for Sub Lane-Gowreeshwapattom road in Kunnukuzhy ward 0.0350 3 13/05/19 57m length of drain is completed. The overall capacity of drain is 20m3 and is a covered drain. 30 Households are benefitted through this Project
228 TVM SWD 2018/11768 : AMRUT – Storm water drainage system for Paruthikuzhi road in Puthenpalli ward 0.4141 4 18/11/19 748m length of drain is completed. The overall capacity of drain is 260m3 and is a covered drain. 270 Households are benefitted through this Project
229 PKD UT Providing pedestrian network and bicycle tracks on both sides of FORT AREA 0.51 6 months 20-12-2018 More improved walkways for the pedestrians around  Kota Maidan
230 PKD UT Pedestrian pathway English church road to BEM School Jn 0.34 6 months 24-03-2019 Paved walkways for the pedestrians  from SBI Jn.to BEM school Jn.
231 PKD SWD Mission school SWD 0.17 6 months 30-01-2019 Drains constructed to eliminate the waterloging issues in front of BEM school 
232 PKD SWD Robinson road drain 0.24 6 months 31-01-2019 Rejuvenated drains for free flow of  storm water along Robinson road
233 PKD SWD Puthupalli theruv- Slaughter House- Mythri Nagar 0.41 6 months 30-01-2019 Drains constructed to eliminate the waterloging issues at Puduppalli street
234 PKD SWD Around District hospital drain 0.42 6 months 08-03-2019 Rejuvenated drains for smooth flow of  storm water near the District Hospital road
235 PKD SWD Yakkara- Murikkav- AKG Nagar 0.26 6 months 27-12-2018 Widened the drains for smooth flow of  storm water from Masjid to the road intersection
236 PKD SWD Municipal Bus stand to Vettilakulam 0.37 6 months 09-01-2019 Reconstructed drains for storm water flow Municipal bus station to Vettilakkulam near the veterinary hospital
237 PKD SWD Tharekkad junction – Koppam SWD 0.32 6 months 25-03-2019 Drains constructed to eliminate the waterloging issues at Tharekkkad to Koppam Jn.street
238 PKD SWD Kunnathoormedu drain 0.44 6 months 29-06-2019 Drains constructed to eliminate the waterloging issues in main Road
239 PKD SWD Sasthri nagar-PVR nagar- Anjali gardens 0.21 6 months 29-06-2019 Reconstruction of existing drain for smooth flow of storm water in Anjali Gardens area
240 PKD SWD Poolakkad Drain 0.29 6 months 19-06-2019 Drains constructed to eliminate the waterloging issues in Mythri Nagar
241 PKD SWD Kalvakulam thodu rejuvanation Part 1 (Near Stadium Stand) 0.49 6 months 09-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
242 PKD SWD Kalvakulam thod desilting and Sidewall -Nr. pleasant street- P2 0.47 6 months 02-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
243 PKD SWD Kalvakulam thodu Desilting and side wall (Nr. Bypass road)- p3 0.48 6 months 07-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
244 PKD SWD Vennakkara-Thirunellayi-puthupallitheru to KSRTC link road-part 2 0.47 6 months 09-07-2019 Constrcution of new drain to eliminate the water logging issues in Vennakkara
245 PKD SWD Constuction of drain near Nurani Jn. 0.14 6 months 03-07-2019 Constrcution of new drain to eliminate the water logging issues in Nurani
246 PKD SWD Mattumantha –Palayam- Chulliyod (Krishna Nagar) 0.29 6 months 19-07-2019 Reconstruction of existing drain to eliminate waterlogging in Mattumantha 
247 PKD SWD Puthur Temple- Kallepully Junction LHS 0.43 6 months 21-07-2019 Constrcution of new drain to eliminate the water logging issues in Puthur area
248 PKD SWD Vadaknthra-Valiyakulm-Pranamkulm -Indrani Nagar 0.48 6 months 02-07-2019 Rejuvenation of drain to eliminate the water logging issues in Chunnambuthara to Railway underpass
249 PKD SWD Kalmndapam Chittoor road – near polyclinic junction to bavanagar-part 3 0.45 6 months 02-07-2019 Rejuvenation of existing drains for smooth water flow from the main road
250 PKD SWD Head Post office to Ramanadhapuram via Koppam – LHS PART 2 0.4 6 months 20-07-2019 Widened the drains for smooth flow of  storm water in Koppam main area
251 PKD Parks Easwar garden park 0.32 6 months 30-05-2018 New park  constructed , located along the Palakkad -Kozhikode byepass.
252 PKD Parks Remadevi park 0.34 6 months 14-11-2017 The park is utilised by the adults and children; giving total refreshment from the park facilities. 1st completed project under AMRUT Palakkad. 
253 PKD Parks Kassim colony park 0.13 6 months 12-12-2018 New park  constructed, located at Jainimed, near to Olavakkod. Facilities for kids and landscaping done in the park.
254 PKD Parks Municipal traffic park 0.26 6 months 30-11-2018 Located near to ULB office, revampin of park done by new compound walls, entry gates and play equipments.
255 PKD Parks Rosegarden park 0.24 6 months 21-07-2019 New park  constructed , located near Mathrubhumi Office in Mattumantha.
256 PKD SWD Puthur Temple- Kallepully Junction-Rhs- 0.5 6 months 30-10-2019 Widened the drains for smooth flow of  storm water in Puthur Jn.area
257 PKD SWD Rejuvenation of drains around Sakunthala junction and construction of tertiary drains 0.5 6 months 30-10-2019 Widened the drains for smooth flow of  storm water in Shakunthala Jn.
258 PKD SWD Manalai- Ramanadhapuram- Aanachira Drain 0.5 6 months 30-10-2019 Rejunvation of drains for smooth flow of  storm water 
259 PKD UT Mission School – Sakunthala Junction footpath 0.47 6 Months 30-12-2019 Paved walkways for the pedestrians  from Mission School to Shankunthala Jn
260 PKD SWD Thirunellayi Manappullikkavu Thodu- between thirunellayi and Chadanakurissi 0.49 6 Months 30-12-2019 DR Protection for Natural Drain
261 PKD SWD Thirunellayi Manappullikkavu Thodu- After thirunellai bridge – part3 0.50 6 Months 30-12-2019 DR Protection for Natural Drain
262 PKD SWD Thirunellayi Manappullikkavu Thodu- near thirunellayi – part 4 0.476 6 Months 30-12-2019 DR Protection for Natural Drain
263 PKD SWD Chakkamthara- Kaikuthu parambu drain – Near Shornur Road 0.26 6 Months 30-12-2019 Reconstruction of existing drain to eliminate waterlogging in Chakkanthara Areas
264 PKD SWD Chakkamthara – Kaikuthu parambu behind Nurani gramam- part 2 0.35 6 Months 30-12-2019 Reconstruction of existing drain to eliminate waterlogging in Chakkanthara Areas
265 PKD SWD GB road to Noorjahan secondary drain 0.39 6 Months 30-11-2019 Reconstruction of existing drain to eliminate waterlogging in GB Road
266 PKD SWD Mattumantha Palayam – Chulliyodu storm water drain (LN Puram) 0.46 6 Months 30-12-2019 Reconstruction of existing drain to eliminate waterlogging in Mattumantha – Chulliyod area
267 PKD SWD Mattumantha Palayam – Chulliyodu drain- near Jaladha nagar  0.43 6 Months 30-12-2019 Reconstruction of existing drain to eliminate waterlogging in Mattumantha – Chulliyod area
268 PKD SWD Sekharipuram- Sankhuvaramedu- near anganwadi – part 2 0.34 6 Months 29-11-2019  
269 PKD SWD Mercy College- Thirunellayi drain LHS Part 1 0.48 6 Months 29-11-2019  
270 PKD SWD Vennakkara- Thirunellayi- near anugraha colony – part 3 0.30 6 Months 31-12-2019  
271 PKD UT Bus shelters for Palakkad City 0.41   22-12-2019 Completed setting up bus shelters in SS at various spots of the City
272 PKD SWD Selva palayam- Indira Nagar SWD 0.26 6months 30-11-2019  
273 PKD SWD Kaalambuzha thodu SWD 0.46 6months 30-11-2019  

  

KWA PROJECTS – 74 Nos.

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 TVM WS Replacing existing 100 mm AC along Mosque lane Pettah ward 0.24 3 14-09-2018 100%
2 TVM WS Replacing existing 80 mm AC along Ambalamukku Mannadi Lane 0.2 6 1/12/2018 100%
3 TVM WS Replacing existing 110 mm PVC along Thilak Nagar Parottukonam 0.23 6 12/2/2019 100%
4 TVM WS Replacing existing 50 mm GI along Musaliar lane Pettah ward 0.07 6 28-11-2018 100%
5 TVM WS Improvement of water supply to Kallampally & Periyamadam area by interconnecting with 110 mm PVC pipe 0.09 6 24-01-2019 100%
6 TVM WS Replacing old AC pipes with 110mm PVC pipes along Gandhi Nagar lane, Tagore Nagar, in Vazhuthacaud Ward, Thiruvananthapuram 0.13 6 28-04-2019 100%
7 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Sreevaraham area 0.5 6 11/3/2019 100%
8 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Ariyankuzhy area 0.7 6 13-03-2019 100%
9 TVM WS Replacing existing damaged pipe and laying 160 mm pvc and altering existing connection to new line at Puthenkada Jn to Magattukadavu under Thirumala section 0.5 6 10/1/2019 100%
10 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu CSI Jn to Annoor under Thirumala section 0.48 6 12/1/2019 100%
11 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu to Swathy Nagar under Thirumala section 0.11 4 21-12-2018 100%
12 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Thirumala to Puthenkada Jn under Thirumala section 0.0261 5 21-12-2018 100%
13 TVM Sewerage Rehabilitation of existing pump and machineries – Supply of Pump set for Kannammoola Pump House 0.345 6 20-08-2018 100%
14 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra nagar via vettamukku1. 0.5 4 31-05-2018 100%
15 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithranagar via vettamukku2. 0.35 4 31-05-2018 100%
16 TVM Sewerage TSS E Block Zone II Laying 300mm dia SW Pipe sewer main from Jagathy Vettamukku sewer main MH 60 towards Koottamvila Ex.MH (N-N1) 0.19 2 10/4/2018 100%
17 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road ( PRA – lane10) at Maruthankuzhy 0.143 6 12/9/2018 100%
18 TVM Sewerage Supplying and laying 200 mm dia SW sewer line from the Existing MH towards Binoy lane at Kizhakke Pattom Residence Association 0.072 4 31-03-2019 100%
19 TVM Sewerage TSS-Supplying and laying 200 mm dia SW pipe sewer line from Padayani Road Ex: MH towards Padayani Gardens Lane No. 8A (PRA G1 to G17) 0.118 6 12/9/2018 100%
20 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara line towards Padayani road association lane No. 05 ( PRA 16-20) at Maruthankuzhy 0.095 6 12/9/2018 100%
21 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara sewer main towards Dwani Lane ( PRA Lane No.07) at Maruthankuzhy 0.144 6 5/8/2018 100%
22 TVM Sewerage TSS – E Block Zone II – Laying 300mm dia SW Sewer main interconnection between Kootanvila and Chittatinkara Sewer main 0.066 2 14-05-2018 100%
23 TVM Sewerage TSS – Laying 250 mm dia DI K9 pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction 1.994 10 26-03-2019 100%
24 TVM Sewerage AMRUTH – TSS Rehabilitation -Increasing the capacity of sewer 150mm dia SW pipe to 200mm dia SW pipe and construction of RCC manholes at Manacadu Harshan Nagar and Seethapuram lane 0.13 5 31-12-2018 100%
25 TVM Sewerage AMRUTH – TSS Rehabilitation – Providing 200mm sewer line from VRA B – 26 to VRA A -22 and connectig to the existing MH near Khadi Board, Vanchiyoor 0.045 7 25-10-2018 100%
26 TVM Sewerage AMRUTH – TSS Rehabilitation -D Block – Supplying and laying 200 mm dia SW sewer branch line from The Existing MH towards Chalakuzhy – Kappil road 0.17 6 27-09-2018 100%
27 TVM Sewerage Laying 150mm SW pipe at Aiswarya lane, Poornima lane, Bharath lane, Mythri lane & Kavuvila lane at Sasthamangalam ward under sewerage section Sasthamangalam 0.29 5 20-10-2018 100%
28 TVM Sewerage AMRUTH -TSS Rehabilitation – Increasing in size of existing sewer main using 300mm dia SWpipe from Edappazhinji towards CSM Nagar III Reach Ch.817M to 1191m 0.375 8 12/1/2019 100%
29 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Jawahar Nagar area under Sewerage Section Sasthamangalam 0.066 5 31-03-2019 100%
30 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Kanaka Nagar area under Sewerage Section Sasthamangalam 0.063 5 16-08-2018 100%
31 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Nanthancodu Nalanda area under Sewerage Section Sasthamangalam 0.064 2 22-05-2018 100%
32 TVM Sewerage AMRUTH -TSS Rehabilitation — Dismantling of damaged brick manhole and re-constructing with RCC manhole at Peroorkada – Ambalamukku area under Sewerage Section Sasthamangalam 0.064 1 17-05-2018 100%
33 TVM Sewerage Urgent rehabilitation works on the sewerage system at Cherukode lane, Kunchalummoodu 0.078 4 30-03-2019 100%
34 TVM Sewerage AMRUTH -TSS Rehabilitation – Urgent rebalitation of dilapidated manholes at Karamana Mangad lane (KMRA) 0.04 6 13-05-2019 100%
35 TVM Sewerage AMRUTH – TSS- Rehabilitation- Urgent reconstruction of dilapidated old brick manholes at Nandavanam Gardens, Valiyasala 0.017 6 13-05-2019 100%
36 TVM Sewerage Supplying and laying 350mm DI K9 pumping main (karimanal pumping station to stilling chamber at bypass junction) 0.7 6 12/1/2019 100%
37 TVM Sewerage (A) 350mm DI K9 PM from well at Kulathoor to stilling chamber at Arasumoodu 1.03 6 27-03-2019 100%
38 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kuravankonam ,Vikramapuram Hills c- under Sewerage Section,Sasthamangalam 0.065 6 21-10-2018 100%
39 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-46 to 53- under Sewerage Section,Sasthamangalam 0.085 3 31-03-2019 100%
40 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-56 to 72- under Sewerage Section,Sasthamangalam 0.124 6 21-10-2018 100%
41 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line C-15 and C-16- under Sewerage Section,Sasthamangalam 0.154 6 31-03-2019 100%
42 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Nethaji Bose road , Marappalam near Keni bridge from NBRA H-1 to NBRA H-10 under Sewerage Section,Sasthamangalam 0.065 6 30-03-2019 100%
43 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Right R C area – under Sewerage Section,Sasthamangalam 0.1276 6 30-10-2018 100%
44 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Central R C area – under Sewerage Section,Sasthamangalam 0.1269 6 30-10-2018 100%
45 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in West R C area – under Sewerage Section,Sasthamangalam 0.1023 4 12/9/2018 100%
46 TVM Sewerage AMRUT SAAP 2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in West R C area under Sewerage section , Sasthamangalam 0.087 8 10/12/2018 100%
47 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 1 0.2 6 24-03-2019 100%
48 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 2 0.2 6 27-03-2019 100%
49 TVM Sewerage TSS-Rehabilitation and upgradation of existing sewer network at Thycadu MG Radhakrishnan Jn towards Poundkulam 0.25 4 25-09-2018 100%
50 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Left R C area – under Sewerage Section,Sasthamangalam 0.1228 6 28-06-2019 100%
51 KLM WS Improvement of existing WS System-Replacement of contaminated AC pipe lines in Kollam Corporation. 1 21 30-09-2018 100% Existing distri.system improved
52 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation (Laying 110mm PVC 2500m, 90mm PVC 4500m). 0.46 14 11/3/2017 100% Existing distri.system improved
53 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation – Replacement of damaged pumpset. 0.76 4 16-03-2017 100% Existing distri.system improved
54 KLM WS Improvement of existing WS System-Replacement of 50HP/75HP VT pumpsets at booster pumphouse at Ananathavalleeswaram. 0.55 6 1/3/2017 100% Existing distri.system improved
55 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to Tubewell pumphouses in Kollam corporation. 0.141 12 30-11-2017 100% Existing distri.system improved
56 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to booster pumphouse at Ananathavalleeswaram with 100Kg Chlorine cylinder. 0.086 15 30-07-2017 100% Existing distri.system improved
57 KLM WS Improvement of existing WS System-Replacement of contaminated AC pipe lines – from  Andamukkam, Thamarakulam, in Kollam Corporation 2.73   23/5/2019 100% Existing distri.system improved
58 ALP WS Digital Survey and soil testing 0.5 6 months 08.03.2018 Digital survey completed
59 KOC WS Replacement of 250mm CI pipe by 300mm DI K9 pipe along Konthuruthi road of Kochi Corporation 2016-17 0.82 8 15.03.2019 100%
60 KOC WS Laying of 450mm DI (K9) pipe from north end of Aroor Edakochi bridge to KWA water tank site at Edakochi. 1.52 6 25.03.2019 100%
61 KOC WS Construction of 15L Ltrs. capacity GL tank at Karuvelippady in Kochi Corporation 3.2 12 30.06.2019 100%
62 KOC WS Replacement of 100mm AC pipe by laying rider line of 160mm PVC (6kg/cm2) along both side of Pandit Karupan road of Kochi Corporation 2016-17 1.75 4 30.06.2019 100%
63 TCR WS AMRUT-Supplying and fixing bulk flowmeters in the transmission mains under Thrissur Corporation area 1 10 27-06-2018 8 bulk meters installed (100%)
64 TCR WS AMRUT- Supplying laying ,testing, commissioning and maintaining of 700 mm DI K9 raw water gravity main from Dam to aerator of 36 mld WTP at Peechi. 1 10 28-09-2017 370 Meter 700mm pipe supplied and layed(100%)
65 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package III 1.025 9months 25.06.2018 50 connections
66 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VII 0.539 6 months 12.10.2018 100 connections
67 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package I 1.5 6months    
68 KOZ WS Rehabilitation of existing old pipes, valvesand interconnections with the existing lines – phase 2- packageII 4.1 6 months    
69 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VI 0.8 6 months 27.12.18 99 connections
70 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package VI 0.849 9months 15.2.2019 NRW reduction
71 KOZ WS Rehabilitation of existing old pipes, valves and interconnections with existing lines – Phase-2- package V 2.8 6 months 19.2.2019 NRW reduction
72 KNR WS Supplying & Laying new distribution line at Pallikunnu & Puzhathi area providing house connection & inter connection with existing line 3.2 11 28-02-2018  
73 KNR WS Laying new distribution line and providing new service connections at Elayavoor 8 9 30-06-2019 Beneficial for 7453 households
74 KNR WS Rehabilitation of existing old  distribution network, valves, house service connection and inter-connections  with existing lines and  providing flow meters etc., including road reformation charges – Edakkad 8.6 15 16.08.2019 Rehabilitation of existing old distribution network at Pallikunnu/Puzhathi zone & also after construction of 24LL Capacity OHSR at the zone