AMRUT – Completed Projects

Details of Completed Works  as on 08.Nov.2019 

  KWA ULB Grand Total
ULB WS SEW Total SWD UT PARKS Total
TVM 12 38 50 55 1 1 57 107
KLM 6 0 6 3 1 4 8 14
ALP 1 0 1 50 4 1 55 56
KOC 4 0 4 26 3 1 30 34
TCR 2 0 2 37 1 2 40 42
GUV 0 0 0 10 0 0 10 10
PKD 0 0 0 22 2 5 29 29
KOZ 7 0 7 0 0 0 0 7
KNR 2 0 2 0 0 0 0 2
Grand Total 33 38 72 202 12 13 229 301

 

ULB PROJECTS – 229 Nos 

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 TVM SWD Construction of drain in Asan Nagar  road in Muttathara Ward   0.098 3 10-11-2016 168m length of drain is completed. 
2 TVM SWD Construction of drain in Aalukadu-Moonattumukku  road in Manikyavilakom Ward   0.1581 3 05-11-2016 275m length of drain is completed. 
3 TVM SWD Construction of drain in VKK Nagar road in Perunthanni  Ward   0.2616 8 30-06-2017 447m length of drain is completed. 
4 TVM SWD Construction of drain in Naalumukku-Chambakkada  road in Sreekanteswaram  Ward   0.1918 6 27-02-2017 350m length of drain is completed. 
5 TVM SWD Construction of drain in Swathi Nagar Lane road in Fort  Ward   0.2764 5 06-01-2017 500m length of drain is completed. 
6 TVM SWD Construction of drain on Chattambi Swammi Nagar road in Perunthanni Ward   0.075 3 20-04-2018 107m length of drain is completed.
7 TVM SWD Construction of drain in Navodaya – Pazhanchira  road in Ambalathara Ward   0.2377 10 30-06-2017 408m length of drain is completed. 
8 TVM SWD Construction of drain on Aryankuzhi road in Kamaleswaram Ward   0.3794 5 17-05-2018 545m length of drain is completed. 
9 TVM SWD Construction of drain on Kulapparakkonam road in Mannanthala Ward   0.4197 6 29-05-2018 600m length of drain is completed. 
10 TVM SWD Construction of drain on Aruvikkarakkonam – Santhipuram road in Njandoorkonam Ward   0.4531 4 26-03-2018 647m length of drain is completed. 
11 TVM SWD Construction of drain near Old National Highway road in Sreekaryam Ward   0.4074 4 19-04-2018 580m length of drain is completed.
12 TVM SWD Construction of drain on Peoples Lane road in Jagathy Ward   0.5553 7 06-06-2018 793m length of drain is completed. 
13 TVM SWD SWD system for P D Nagar (from Vidya Gardens) in Vallakadavu ward 0.0957 2 23-10-2018 173m length of drain is completed.
14 TVM SWD Construction of drain on Oruvakkonam – Kattayikkonam road in Kattaikonam Ward   0.5539 3 26-05-2018 790m length of drain is completed. 
15 TVM SWD SWD system for Marappalam Gardens road in Muttada ward 0.3472 4 19-11-2018 700m length of drain is completed. 
16 TVM SWD Construction of drain on Parayikkadavu Theruvila road in Mudavanmugal Ward   0.2115 6 11-08-2018 300m length of drain is completed. 
17 TVM SWD SWD system for Thirumala Alapuram road in Thirumala ward 0.5593 4 02-11-2018 997m length of drain is completed. 
18 TVM SWD SWD system for Priyadarshini Nagar in Vallakadavu ward 0.1364 2 12-09-2018 242m length of drain is completed. 
19 TVM SWD Althara Temple Back side Road in Vazhuthacaud ward 0.079 3 30-10-2018 140m length of drain is completed. 
20 TVM SWD Thamburan Nagar area Road in Vazhuthacaud ward 0.1069 4 06-10-2018 195m length of drain is completed.
21 TVM SWD SWD system for Bilal road in Vallakadavu ward 0.1195 2 26-10-2018 192m length of drain is completed. 
22 TVM SWD SWD system for Valiyathura muttathara road in Vallakadavu ward 1.4209 4 08-11-2018 882m length of drain is completed. 
23 TVM SWD SWD system for Golf link road in Kowdiar ward 0.2784 5 14-12-2018 497m length of drain is completed. 
24 TVM SWD SWD system for Amman kovil kazhakootam market road in kazhakootam ward 0.2871 4 27-07-2018 400m length of drain is completed. 
25 TVM SWD SWD system for Elangam Panayil road in Nedumcaud ward 0.0885 4 14-11-2018 153m length of drain is completed. 
26 TVM SWD SWD system for Kesavadev road to Thrivikramangalam Thamalam Jn in Mudavanmugal ward 0.3442 5 03-01-2019 656m length of drain is completed. 
27 TVM SWD SWD system for Chembaka Nagar area in Vazhuthacaud ward 0.3239 5 20-12-2018 577m length of drain is completed. 
28 TVM SWD Construction of drain on Malamugal Kachani road in Kachani  Ward   0.5241 7 03-10-2018 848m length of drain is completed. 
29 TVM SWD Construction of drain on Vazhathottam Kayalkara road in Poomkulam Ward   1.2325 8 08-01-2019 1760m length of drain is completed. 
30 TVM SWD Construction of drain on Melemcodu road in Mannanthala Ward   0.5419 4 20-06-2018 774m length of drain is completed.
31 TVM SWD SWD system for Jyothipuram railway bridge-Uijjaini Mahakali Amman Kovil road in Valiyasala ward 0.1905 3 30-11-2018 319m length of drain is completed. 
32 TVM SWD Construction of drain on Thaliyal Thelungu Chetti Theruvu road in Karamana Ward 0.4845 7 07-01-2019 619m length of drain is completed. 
33 TVM SWD  SWD system for Govt UPS to Sewage Farm in Beemapally ward 0.2884 4 29-12-2018 508m length of drain is completed.
34 TVM SWD Construction of drain on Vattavilakam -Keraladithyapuram road in Chellamangalam Ward   0.5115 12 02-02-2019 730m length of drain is completed.
35 TVM SWD  AMRUT – SWD system for Chitra Nagar road in Poojappura ward 0.1537 3 16-10-2018 270m length of drain is completed.
36 TVM SWD SWD system for Kunnukuzhy-Kannamoola road in Kunnukuzhy ward 1.1676 7 22-02-2019 1900m length of drain is completed. 
37 TVM SWD SWD system for Thanivilakam Lane Nemom in Ponnumangalam ward 0.0965 6 28-01-2019 170m length of drain is completed.
38 TVM SWD Construction of drain on Cheenikkonam Maruvathoor   road in Nettayam  Ward   0.213 12 01-02-2019 305m length of drain is completed.
39 TVM SWD  SWD system for Shastri Nagar road / Mythodu Kuzhy (Right) in Mudavanmugal ward 0.5962 2 08-10-2018 1180m length of drain is completed. 
40 TVM SWD SWD system for Kurattoor road in Mudavanmugal ward 0.041 5 14-01-2019 67m length of drain is completed.
41 TVM SWD Construction of drain on Ganga Nagar – Thrimoorthy Nagar road – KBS Line in Kamaleswaram Ward   0.6033 10 31-12-2018 860m length of drain is completed.
42 TVM SWD Construction of drain on Thottam road in Ambalathara Ward   0.2884 12 18-02-2019 412m length of drain is completed. 
43 TVM SWD AMRUT – SWD system for MLA Road near Thrivikramangalam -Thamalam in Mudavanmugal ward 1.2292 3 08-12-2018 2300m length of drain is completed. 
44 TVM SWD 2018/11994 : AMRUT – SWD system for Thirumala-Mangad road in Thirumala ward 0.3996 4 27-02-2019 714m length of drain is completed. 
45 TVM SWD Construction of drain on Mithra Nagar road in Ambalathara Ward 0.3846 6 16-11-2018 549m length of drain is completed. 
46 TVM SWD 2018/11796 : AMRUT – SWD system for Keni road in Muttada ward 0.475 4 08-04-2019 678m length of drain is completed. 
47 TVM SWD 2018/11987 : AMRUT – SWD system for Arayalor road in Thirumala ward 0.594 4 04-04-2019 848m length of drain is completed.
48 TVM SWD Construction of drain on Manava Nagar road in Perunthanni Ward   0.2601 3 24-01-2019 370m length of drain is completed. 
49 TVM SWD 2018/11337 : AMRUT – SWD system for towards Melemukku Mailadi Kadavu road in Valiyasala ward 0.6706 3 months 07-02-2019 113m length of drain is completed.
50 TVM SWD 2018/11985 : AMRUT – SWD system for CSM Nagar road in Vazhuthacaud ward 0.4198 2 months 14-03-2019 748m length of drain is completed. 
51 TVM SWD 2018/11996 : AMRUT – SWD system for Kesavan road in Poojappura ward 0.1261 3 months 17-05-2019 230m length of drain is completed.
52 TVM SWD 2018/11781 : AMRUT – SWD system for N S Dippo road in Vallakadavu ward 0.1508 3 months 10-06-2019 266m length of drain is completed. 
53 TVM SWD 2018/11666 : AMRUT – SWD system for Settlement Colony in Ponnumangalam ward 0.1997 3 months 11-04-2019 362m length of drain is completed. 
54 TVM SWD 2018/11305 : AMRUT – Storm water drainage system for Pulimoodu-Gandhari Amman Kovil road in Thampanoor ward 0.2464 3 months 02.06.2019 430m length of drain is completed. 
55 TVM SWD 2018/11769 : AMRUT – Storm water drainage system for Milk Colony road in Bheemapally East ward 0.6090 4 months 27.07.2019 1085m length of drain is completed.
56 TVM UT Construction of foot path from Vazhuthacaud forest office jn to DPI along the left side of road Vazhuthacaud ward 0.09 3 months 18-09-2017 350m length Interlocking tiles laid
57 TVM Parks Construction and beautification of Thechanvila Park in Punnakkamugal ward 0.3 6 months 26-05-2017 Renovation of the pond including hand rails, Walk way, seating facilities etc was provided. 
58 KLM SWD Uliakovil-Ashtamudi Drain-Phase I 0.41 2 28-01-2017 100%-Drainage system improved
59 KLM SWD Uliakovil Area Phase3 0.14 8 23-12-2018 100%-Drainage system improved
60 KLM SWD Mundakkal 0.2 8 30-06-2019 100%-Drainage system improved
61 KLM Parks Improvement of Parks-phase 1(TK Divakaran Park , Nehru Park) 0.272 5 28-01-2017 100%-Park status improved
62 KLM Parks Corporation Park 0.4 12 30-06-2019 100%-Park status improved
63 KLM Parks Kambiyilkulam 0.27 12 30-06-2019 100%-Park status improved
64 KLM Parks Asraamom 1.0615 11 7-11-2019 100%-Park status improved
65 KLM UT Footpath from AR Camp to Railway Station Road-Phase I 0.33 12 15-11-2017 100%-Drainage system and the pedestrian traffic improved
66 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Thazhathparamb temple thodu at Palace Ward 0.24 6months 05-10-2018 mitigation of water logging
67 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Koikkaramparambu thodu at Palace Ward 0.13 6months 31-05-2018 mitigation of water logging
68 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Drain Joining Kottaram thodu-Vadasserry at Palace Ward 0.4 6months 28-09-2018 mitigation of water logging
69 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – SNDP Thodu at Palace Ward 0.41 6months 12-03-2018 mitigation of water logging
70 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Valappil thodu at Zilla Court Ward 0.08 6months 11-03-2018 mitigation of water logging
71 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Kaniyaparambu Thodu at Thathampally Ward 0.28 6months 28-09-2018 mitigation of water logging
72 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – karukapparambu 0.08 6months 31-05-2018 mitigation of water logging
73 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kadarveli thodu 0.24 6months 29-08-2018 mitigation of water logging
74 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kottamkulangara reach i 0.38 6months 19-12-2018 mitigation of water logging
75 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – kottamkulangara reach iii 0.43 6months 12-11-2018 mitigation of water logging
76 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 01 0.09 6months 25-11-2018 mitigation of water logging
77 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 02 0.33 6months 10-10-2018 mitigation of water logging
78 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Kalappura – Reach 03 0.46 6months 23-11-2018 mitigation of water logging
79 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near Karuveli Puthenpurackal road culvert in Thondankulangara ward. 0.12 6months 14-09-2018 mitigation of water logging
80 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain Near Vanakkumasa Church 0.18 6months 25-11-2018 mitigation of water logging
81 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Near Indira Jn West road culvert 0.12 6months 14-09-2018 mitigation of water logging
82 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Various drains in Mullathvalapp Ward 0.43 6months 22-01-2019 mitigation of water logging
83 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Ayyamparambu thodu 0.4 6months 31-01-2019 mitigation of water logging
84 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – drain near cd pappachan 0.05 6months 25-01-2019 mitigation of water logging
85 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Devi nagar 0.07 6months 13-02-2019 mitigation of water logging
86 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Matsyagandhi 0.24 6months 26-02-2019 mitigation of water logging
87 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Kottamkulangara Reach 4 0.23 6months 23-02-2019 mitigation of water logging
88 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Chanda thodu to SN Kalasamithi 0.36 6months 02-06-2019 mitigation of water logging
89 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain back of Smashanam to Illickal Road 0.23 6months 02-06-2019 mitigation of water logging
90 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Old NSS Karayogam thodu 0.05 6months 12-03-2019 mitigation of water logging
91 ALP UT Alappuzha Municipality- SAAP I – Pedestrian Network at Indira Jn 0.19 6months 12-10-2018 Improved Pedestrian safety
92 ALP UT Alappuzha Municipality- SAAP III – pedestrian Network at jain temple road 0.06 6months 02-06-2019 Improved Pedestrian safety
93 ALP Parks General hospital park 0.07 6months 19-11-2018 Green space development
94 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Iravukadu – Kochu Rani Drain 0.26 6months 22-07-2019 mitigation of water logging
95 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM BYEPASS TO VATTAYAL ROAD 0.36 6months 14-06-2019 mitigation of water logging
96 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Near Malgar Bridge 0.16 6months 19-04-2019 mitigation of water logging
97 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain joining Rani Canal 0.04 6months 24-07-2019 mitigation of water logging
98 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP I – Drain Joining Ayyappan Pozhi near community hall at Railway Station Ward 0.21 6months 09-04-2019 mitigation of water logging
99 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Malikakkalchira 0.08 6months 09-04-2019 mitigation of water logging
100 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM ARYAMPARAMBU CULVERT TO ST. JOSEPH KURISHADY 0.45 6months 03-04-2019 mitigation of water logging
101 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DRAIN FROM REFORMING VAYANASHALA TO ST. JOSEPH KURISHADY 0.41 6months 21-01-2019 mitigation of water logging
102 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – POONTHOPPU ROAD TO AS CANAL ROAD 0.35 6months 02-04-2019 mitigation of water logging
103 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Vayalar Area 0.22 6months 13-06-2019 mitigation of water logging
104 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near Vallamparambil 0.06 6months 18-06-2019 mitigation of water logging
105 ALP UT Alappuzha Municipality- SAAP I – Pedestrian Network at Thumpoly Church 0.12 6months 03-04-2019 Improved Pedestrian safety
106 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Parusseri thodu 0.41 6months 22-07-2019 mitigation of water logging
107 ALP UT Alappuzha Municipality- SAAP II – Pedestrian Network at A.N Puram 0.17 6months 22-08-2019 Improved Pedestrian safety
108 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Valiyamaram HB padam 0.03 6months 22-08-2019 mitigation of water logging
109 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Drain Near Anganavadi 129 to Thalavady temple road -Kottamkulangara Reach 02 0.28 6months 27-07-2019 mitigation of water logging
110 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP II – Papanagar-2 0.23 6months 18-07-2019 mitigation of water logging
111 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Drain near to malikka mukka 0.12 6months 17-07-2019 mitigation of water logging
112 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – Municipal Stadium – Chirayil Drain 0.08 6months 27-07-2019 mitigation of water logging
113 ALP SWD Starting point to Shornur Canal road 0.2 6months 03-05-2019 mitigation of water logging
114 ALP SWD Pallikkandath to Methassery at Zilla Court Ward 0.33 6months 27-07-2019 mitigation of water logging
115 ALP SWD Holy Family school to Chemmoth road 0.14 6months 02-09-2019 mitigation of water logging
116 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DrainNear Mangalam road culvert 0.25 6months 23-04-2019 mitigation of water logging
117 ALP SWD Alappuzha Municipality – SWD in Various Wards – SAAP III – DrainNearKalarcode to Yakthi House 0.3 6months 27-05-2019 mitigation of water logging
118 ALP SWD Malikayil Thodu at Zilla Court Ward 0.34 6months 16-10-2019 mitigation of water logging
119 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Mammood Road To Poonthoppu Road 0.45 6months 03-10-19 mitigation of water logging
120 ALP SWD Alappuzha Municipality – Storm Water Drainage in Various Wards – SAAP III -Ouseph House to Thadickel Vadakke Veedu 0.11 6months 03-10-19 mitigation of water logging
121 KOC SWD Renovation of drains along Kannanthodathu road, Tricovil road 0.22 3months 09-04-2018 100%
122 KOC SWD Drain from Lisie jn. To Kottekanal 0.48 5 months 11-04-2018 100%
123 KOC SWD New drain along Kochakko road Athiparambu road and Masjid road -div- 45 0.55 5 months 13-11-2018 100%
124 KOC SWD Drain from Chilavannur road to Chilavannur river 0.39 5 months 26-11-2018 100%
125 KOC SWD Construction of drain along Kaloor -Kathrikadavu road (old) 0.74 6 months 12-05-2018 100%
126 KOC SWD Drain near Thrithwam 0.39 4 months 12-05-2018 100%
127 KOC SWD Renovation of Palarivattam Thammanam Thodu 1.24 1 year 17-12-2018 100%
128 KOC SWD Drain repair along Chennankulangara road at Edappally 0.26 6 months 13-01-2019 100%
129 KOC SWD Kizhavana road east drain 0.09 6 months 06-03-2019 100%
130 KOC SWD Drain from North over Bridge to Lissie 0.64 6 months 02-02-2019 100%
131 KOC SWD Construction of drain along St. Vincent road  0.61 6 months 15-02-2019 100%
132 KOC SWD Cover Slab above Parayapilly Thodu Near Amrutha Hospital -Kunnampuram 0.387 6 months 26-03-2019 100%
133 KOC SWD Joys Thodu, boundary Thodu & athirthy Thodu 0.428 6 months 31-03-2019 100%
134 KOC SWD Renovation of Binni Thodu div-13 0.496 6 months 15-06-2019 100%
135 KOC SWD Renovation of drain along TKC road 0.297 4 months 07-06-2019 100%
136 KOC SWD Side protection of Thuruthelchal Thodu Chakkaraparamba 0.175 4 months 25-06-2019 100%
137 KOC SWD Drain along SRM road at Pachalam 0.11 3 months 01-07-2019 100%
138 KOC SWD Puthukalavattom Elamakara drain repair 0.5 5 months 17-08-2019 100%
139 KOC SWD Construction of drainage at Mattanchery Synagog, Mattanchery palace and Mattanchery boat jetty 1.29 8 months 28-05-2019 100%
140 KOC SWD Renovation of drains at VAT junction, Kanosa nagar, Illiparambu 0.253 6 months 30-08-2019 100%
141 KOC SWD Rejuvenation of drains from Kappalandi Mukku to Panayappilly in Jew town 0.182 7 months 30-08-2019 100%
142 KOC SWD Renovation of Peruvelithodu, Karuppally thodu & Punathil Padam thodu 1.079 6 months 30-08-2019 100%
143 KOC SWD Pallichal canal 0.575 6 months 18-12-2018 100%
144 KOC SWD Renovation  of Vivekananda Thodu from South railway station to Mullassery canal 0.832 6 months 26/06/2019 100%
145 KOC SWD Drain from Waterland to Chirakkal puzha – Pullardesham & Chirakkal puzha 0.343 6 months 29/06/2019 100%
146 KOC SWD Desilting Managalavanam Thodu 0.198 4 months 22.09.2019 100%
147 KOC Parks Renovation of St. John Park 0.36 8 months 21-01-2018 100%
148 KOC UT Construction of Foot Path  from Jose junction to Atlantis at MG Road 1.73 9 months 04-06-2018 100%
149 KOC UT Foot path from Atlantis junction to Thevara Junction at MG Road 1.7 9 months 18-07-2019 100%
150 KOC UT Foot path from line Jn to Samskara Jn. at Palarivattom 0.403 5 months 29/03/2019 100%
151 TCR SWD SWD-Phase-1- WORK-2-Netaji Rd- Mother land Rd 0.71 5 09-11-2018 100%
152 TCR SWD SWD-Phase-1-WORK-3-Shanthi Rd 0.49 4 26-12-2018 100%
153 TCR SWD SWD-Phase-1-WORK-12-South Pentark-Elite hospital 0.55 5 20-10-2018 100%
154 TCR SWD SWD-Phase-2-work-46 pc thomas rd 0.67 5 06-08-2018 100%
155 TCR SWD SWD-Phase-3-ND BRIDGE -JAVAHAR WORK 72 0.3 4 09-11-2018 100%
156 TCR SWD SWD-Phase-3-Div 50 WORK 77 0.1 3 04-09-2018 100%
157 TCR SWD SWD Phase 1(Div 28. C V Kochunni road)work 1 0.3 4 10-10-2018 100%
158 TCR SWD SWD Phase 3(Div 25,Nehru Church -Thiruthur Temple Road ) Work 73 0.68 5 30-03-2018 100%
159 TCR SWD SWD Phase1(Div 28. Puthanangadi Road) Work 4 0.24 3 27-11-2018 100%
160 TCR SWD SWD Phase 1 (Div 20. Shastri Lane Part 1,Div 20. Shastri Lane Part 2)Work 7 0.42 4 31-03-2018 100%
161 TCR SWD SWD Phase 1 (Div 34. Metropolitan Hospital-Baliya Thodu, Work 11 0.47 4 15-11-2018 100%
162 TCR SWD SWD Phase 1 (Div 34. POST OFFICE – BALIYA THODU) Work 13 0.44 4 03-10-2018 100%
163 TCR SWD SWD(DIV 1, )Ramnagar Rd-1,2,3,4Work 27 0.68 5 26-11-2018 100%
164 TCR SWD SWD-Phase 2 (Div 1 Jayaprokash Road) Work 32 0.16 3 04-09-2018 100%
165 TCR SWD SWD Phase 2 (Div 23,Unity Road Part 1 & 2 )Work 48 0.24 4 27-09-2018 100%
166 TCR SWD SWD Phase 3(Div 52,West fort Achuthamenon Road-2 )Work 86 0.54 5 09-08-2018 100%
167 TCR SWD SWD Phase 2 (Div 1,Jayaprakash Lane)Work 33 0.07 5 25-09-2018 100%
168 TCR SWD SWD Phase 1(Div 34. Shakthan nagar) Work 15 0.96 5 15-12-2019 100%
169 TCR SWD SWD Phase 3(Div 51,Thopilmoola-Kalvari )Work 75 0.44 4 28-09-2018 100%
170 TCR SWD SWD Phase 1( DIV 34. Thankamani Bus Stop)Work 16 0.28 3 24-10-2018 100%
171 TCR SWD SWD Phase 2 (Div 4,Viyyur Pandikkavu-Peringavu Canal )Work 40 0.29 4 22-12-2018 100%
172 TCR SWD SWD Phase 2 (Div 9,Kuttumukku Road )Work 42 0.14 3 15-02-2019 100%
173 TCR SWD SWD Phase1 (Div 34. Post Office , LIC Junction) Work 14 0.67 5 09-11-2018 100%
174 TCR SWD SWD Phase 2 (Div 23,Pallikkulam Road )Work 47 0.1 3 31-07-2018 100%
175 TCR SWD SWD Phase 3(Div 36,A R menon Road )Work 82 0.3 4 26-09-2018 100%
176 TCR SWD SWD Phase 1(Div 33 Pattala Kinar Road)Work 10 0.59 5 02-04-2019 100%
177 TCR SWD SWD- Div 01, Seetharamaswami Temple Road, (Work 28 ) 0.71 5 25-10-2018 100%
178 TCR SWD SWD Phase 3(Div 7,Mannumukkodu Vimala College-Cherutta) Work 69 0.43 4 31-03-2019 100%
179 TCR SWD SWD Phase 3(Div 9,Kuttumukku Road )Work 70 0.4 4 29-12-2018 100%
180 TCR SWD SWD Phase 2 (Div 20, Jesus Lane Road ,Alukka Angadi Road ,Nazerth Angadi Road )Work 44 0.97 5 31-03-2019 100%
181 TCR SWD -SWD Phase 2  Udayanagar NO9 Drain Work 31  0.21 4 10-12-2018 100%
182 TCR SWD SWD Phase 2 (Div 23,Thottathil Lane )Work 50 0.07 3 10-04-2019 100%
183 TCR UT Urban Transport Phase 3(Div 23- Unity road 1 and Unity road 2)Work 59 0.09 3 03-11-2019 100%
184 TCR Parks Rejuvenation of Nehru park in Thrissur Corporation Phase I 0.91 5 03-12-2018 100%
185 TCR SWD SWD Phase 1 -( Div 28. Ancheri – Perivankulangara road – 1,2,3 + Netaji road – Motherland road – 2,3 + Kundolipadam road)Work 5 0.97 5 11-05-2018 100
186 TCR SWD SWD Phase 2 (Div 23,Thottanpetta Road )Work 52 0.04 3 04-10-2019 100
187 TCR Parks Rennovation of Nehru park Phase 2 0.69 4 28-03-2019 100
188 TCR SWD SWD Phase1 (Div 33. Pattala Kinnar Road,ST. Joseph Model School)Work 8 0.8 5 26-03-2019 100
189 TCR SWD SWD  Phase 3(Div 36,Marar Road )Work 83 0.14 4 28-02-2019 100
190 TCR SWD SWD  Phase 3(Div 36,Machingal lane Road )Work 84 0.17 4 19-01-2019 100
191 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 A 0.15 6 15-03-2019 Coverage of drains increased. 3 water logging points eliminated
192 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 E 0.12 6 24-12-2018 Coverage of drains increased. 2 water logging points eliminated
193 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 1 F 0.1 6 0.3.12.2018 Coverage of drains increased. 3 water logging points eliminated
194 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 B 0.15 6 22.12.2018 Coverage of drains increased. 3 water logging points eliminated
195 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 C 0.142 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
196 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 D 0.145 6 22.02.2019 Coverage of drains increased. 3 water logging points eliminated
197 GUV SWD SAAP 2015-16, 2016-17, 2017-18 Package I – Covering and repair of minor drains in 16 different locations of the municipal area- Package 3 E 0.053 6 22.02.2019 2 Water logging points eliminated
198 GUV SWD SAAP 2016-17 Package II – Covering and repair of minor drains in 16 different locations of the municipal area- Phase II 0.14 6 21-03-2019 4 Water logging points eliminated
199 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – ID 0.11 6 29-03-2019 3 Water logging points eliminated
200 GUV SWD SAAP 2015-16 Package I – Covering and repair of minor drains in 16 different locations of the municipal area-PACKAGE – IC 0.11 6 05-05-2019 3 Water logging points eliminated
201 PKD UT Providing pedestrian network and bicycle tracks on both sides of FORT AREA 0.51 6 months 20-12-2018 More improved walkways for the pedestrians around  Kota Maidan
202 PKD UT Pedestrian pathway English church road to BEM School Jn 0.34 6 months 24-03-2019 Paved walkways for the pedestrians  from SBI Jn.to BEM school Jn.
203 PKD SWD Mission school SWD 0.17 6 months 30-01-2019 Drains constructed to eliminate the waterloging issues in front of BEM school 
204 PKD SWD Robinson road drain 0.24 6 months 31-01-2019 Rejuvenated drains for free flow of  storm water along Robinson road
205 PKD SWD Puthupalli theruv- Slaughter House- Mythri Nagar 0.41 6 months 30-01-2019 Drains constructed to eliminate the waterloging issues at Puduppalli street
206 PKD SWD Green Garden- Othungodu- Kallikkad drain 0.4 6 months 31-01-2019 Drains constructed to eliminate the waterloging issues at Green garden to Kallikkad street
207 PKD SWD Around District hospital drain 0.42 6 months 08-03-2019 Rejuvenated drains for smooth flow of  storm water near the District Hospital road
208 PKD SWD Yakkara- Murikkav- AKG Nagar 0.26 6 months 27-12-2018 Widened the drains for smooth flow of  storm water from Masjid to the road intersection
209 PKD SWD Municipal Bus stand to Vettilakulam 0.37 6 months 09-01-2019 Reconstructed drains for storm water flow Municipal bus station to Vettilakkulam near the veterinary hospital
210 PKD SWD Tharekkad junction – Koppam SWD 0.32 6 months 25-03-2019 Drains constructed to eliminate the waterloging issues at Tharekkkad to Koppam Jn.street
211 PKD SWD Mythri Nagar- Haritha Nagar- KSRTC Link Road 0.21 6 months 29-01-2019 Drains constructed to eliminate the waterloging issues  and solid waste duming issues at this section of street
212 PKD SWD Kunnathoormedu drain 0.44 6 months 29-06-2019 Drains constructed to eliminate the waterloging issues in main Road
213 PKD SWD Sasthri nagar-PVR nagar- Anjali gardens 0.21 6 months 29-06-2019 Reconstruction of existing drain for smooth flow of storm water in Anjali Gardens area
214 PKD SWD Poolakkad 0.29 6 months 19-06-2019 Drains constructed to eliminate the waterloging issues in Mythri Nagar
215 PKD SWD Kalvakulam thodu rejuvanation Part 1 (Near Stadium Stand) 0.49 6 months 09-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
216 PKD SWD Kalvakulam thod desilting and Sidewall -Nr. pleasant street- P2 0.47 6 months 02-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
217 PKD SWD Kalvakulam thodu Desilting and side wall (Nr. Bypass road)- p3 0.48 6 months 07-07-2019 Reconstruction of existing drain to eliminate waterlogging in Kalvakkulam Area
218 PKD SWD Vennakkara-Thirunellayi-puthupallitheru to KSRTC link road-part 2 0.47 6 months 09-07-2019 Constrcution of new drain to eliminate the water logging issues in Vennakkara
219 PKD SWD Constuction of drain near Nurani Jn. 0.14 6 months 03-07-2019 Constrcution of new drain to eliminate the water logging issues in Nurani
220 PKD SWD Mattumantha –Palayam- Chulliyod 0.29 6 months 19-07-2019 Reconstruction of existing drain to eliminate waterlogging in Mattumantha 
221 PKD SWD Puthur Temple- Kallepully Junction 0.43 6 months 21-07-2019 Constrcution of new drain to eliminate the water logging issues in Puthur area
222 PKD SWD Vadaknthra-Valiyakulm-Pranamkulm -Indrani Nagar 0.48 6 months 02-07-2019 Rejuvenation of drain to eliminate the water logging issues in Chunnambuthara to Railway underpass
223 PKD SWD Kalmndapam Chittoor road – near polyclinic junction to bavanagar-part 3 0.45 6 months 02-07-2019 Rejuvenation of existing drains for smooth water flow from the main road
224 PKD SWD Head Post office to Ramanadhapuram via Koppam – LHS PART 2 0.4 6 months 20-07-2019 Widened the drains for smooth flow of  storm water in Koppam main area
225 PKD Parkss Easwar garden park 0.32 6 months 30-05-2018 New park  constructed , located along the Palakkad -Kozhikode byepass.
226 PKD Parkss Remadevi park 0.34 6 months 14-11-2017 The park is utilised by the adults and children; giving total refreshment from the park facilities. 1st completed project under AMRUT Palakkad. 
227 PKD Parkss Kassim colony park 0.13 6 months 12-12-2018 New park  constructed, located at Jainimed, near to Olavakkod. Facilities for kids and landscaping done in the park.
228 PKD Parkss Municipal traffic park 0.26 6 months 30-11-2018 Located near to ULB office, revampin of park done by new compound walls, entry gates and play equipments.
229 PKD Parkss Rosegarden park 0.24 6 months 21-07-2019 New park  constructed , located near Mathrubhumi Office in Mattumantha.

  

KWA PROJECTS – 72 Nos.

Sl.No City Sector Name of Work Awarded Amount (in Cr.) Period as per Agreement ( in months) Date of Completion (Date of Completion) Impact of the project / Physical Achievement
1 TVM WS Replacing existing 100 mm AC along Mosque lane Pettah ward 0.24 3 14-09-2018 100%
2 TVM WS Replacing existing 80 mm AC along Ambalamukku Mannadi Lane 0.2 6 01-12-2018 100%
3 TVM WS Replacing existing 110 mm PVC along Thilak Nagar Parottukonam 0.23 6 12-02-2019 100%
4 TVM WS Replacing existing 50 mm GI along Musaliar lane Pettah ward 0.07 6 28-11-2018 100%
5 TVM WS Improvement of water supply to Kallampally & Periyamadam area by interconnecting with 110 mm PVC pipe 0.09 6 24-01-2019 100%
6 TVM WS Replacing old AC pipes with 110mm PVC pipes along Gandhi Nagar lane, Tagore Nagar, in Vazhuthacaud Ward, Thiruvananthapuram 0.13 6 28-04-2019 100%
7 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Sreevaraham area 0.5 6 11-03-2019 100%
8 TVM WS Replacement of existing 150mm AC pipe with 160mm pvc at Ariyankuzhy area 0.7 6 13-03-2019 100%
9 TVM WS Replacing existing damaged pipe and laying 160 mm pvc and altering existing connection to new line at Puthenkada Jn to Magattukadavu under Thirumala section 0.5 6 10-01-2019 100%
10 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu CSI Jn to Annoor under Thirumala section 0.48 6 12-01-2019 100%
11 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Mangattukadavu to Swathy Nagar under Thirumala section 0.11 4 21-12-2018 100%
12 TVM WS Replacing existing damaged pipe and laying 110 mm pvc and altering existing connection to new line at Thirumala to Puthenkada Jn under Thirumala section 0.0261 5 21-12-2018 100%
13 TVM Sewerage Rehabilitation of existing pump and machineries – Supply of Pump set for Kannammoola Pump House 0.345 6 20-08-2018 100%
14 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithra nagar via vettamukku1. 0.5 4 31-05-2018 100%
15 TVM Sewerage TSS- D Block zone II – Laying 600mm dia RCC NP3 pipe sewer main from Edappazhinji to Chithranagar via vettamukku2. 0.35 4 31-05-2018 100%
16 TVM Sewerage TSS E Block Zone II Laying 300mm dia SW Pipe sewer main from Jagathy Vettamukku sewer main MH 60 towards Koottamvila Ex.MH (N-N1) 0.19 2 10-04-2018 100%
17 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara lane towards Padayani road ( PRA – lane10) at Maruthankuzhy 0.143 6 12-09-2018 100%
18 TVM Sewerage Supplying and laying 200 mm dia SW sewer line from the Existing MH towards Binoy lane at Kizhakke Pattom Residence Association 0.072 4 31-03-2019 100%
19 TVM Sewerage TSS-Supplying and laying 200 mm dia SW pipe sewer line from Padayani Road Ex: MH towards Padayani Gardens Lane No. 8A (PRA G1 to G17) 0.118 6 12-09-2018 100%
20 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara line towards Padayani road association lane No. 05 ( PRA 16-20) at Maruthankuzhy 0.095 6 12-09-2018 100%
21 TVM Sewerage TSS- E Block Zone III – Supplying and laying 200 mm dia SW pipe branch sewer line from the existing Konathukulangara sewer main towards Dwani Lane ( PRA Lane No.07) at Maruthankuzhy 0.144 6 05-08-2018 100%
22 TVM Sewerage TSS – E Block Zone II – Laying 300mm dia SW Sewer main interconnection between Kootanvila and Chittatinkara Sewer main 0.066 2 14-05-2018 100%
23 TVM Sewerage TSS – Laying 250 mm dia DI K9 pumping main from Mudavanmugal Pump House to Jagathy Junction and construction of Stilling Chamber at Jagathy Junction 1.994 10 26-03-2019 100%
24 TVM Sewerage AMRUTH – TSS Rehabilitation -Increasing the capacity of sewer 150mm dia SW pipe to 200mm dia SW pipe and construction of RCC manholes at Manacadu Harshan Nagar and Seethapuram lane 0.13 5 31-12-2018 100%
25 TVM Sewerage AMRUTH – TSS Rehabilitation – Providing 200mm sewer line from VRA B – 26 to VRA A -22 and connectig to the existing MH near Khadi Board, Vanchiyoor 0.045 7 25-10-2018 100%
26 TVM Sewerage AMRUTH – TSS Rehabilitation -D Block – Supplying and laying 200 mm dia SW sewer branch line from The Existing MH towards Chalakuzhy – Kappil road 0.17 6 27-09-2018 100%
27 TVM Sewerage Laying 150mm SW pipe at Aiswarya lane, Poornima lane, Bharath lane, Mythri lane & Kavuvila lane at Sasthamangalam ward under sewerage section Sasthamangalam 0.29 5 20-10-2018 100%
28 TVM Sewerage AMRUTH -TSS Rehabilitation – Increasing in size of existing sewer main using 300mm dia SWpipe from Edappazhinji towards CSM Nagar III Reach Ch.817M to 1191m 0.375 8 12-01-2019 100%
29 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Jawahar Nagar area under Sewerage Section Sasthamangalam 0.066 5 31-03-2019 100%
30 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Kanaka Nagar area under Sewerage Section Sasthamangalam 0.063 5 16-08-2018 100%
31 TVM Sewerage AMRUTH -TSS Rehabilitation – Dismantling of damaged brick manhole and re-constructing with RCC manhole at Nanthancodu Nalanda area under Sewerage Section Sasthamangalam 0.064 2 22-05-2018 100%
32 TVM Sewerage AMRUTH -TSS Rehabilitation — Dismantling of damaged brick manhole and re-constructing with RCC manhole at Peroorkada – Ambalamukku area under Sewerage Section Sasthamangalam 0.064 1 17-05-2018 100%
33 TVM Sewerage Urgent rehabilitation works on the sewerage system at Cherukode lane, Kunchalummoodu 0.078 4 30-03-2019 100%
34 TVM Sewerage AMRUTH -TSS Rehabilitation – Urgent rebalitation of dilapidated manholes at Karamana Mangad lane (KMRA) 0.04 6 13-05-2019 100%
35 TVM Sewerage AMRUTH – TSS- Rehabilitation- Urgent reconstruction of dilapidated old brick manholes at Nandavanam Gardens, Valiyasala 0.017 6 13-05-2019 100%
36 TVM Sewerage Supplying and laying 350mm DI K9 pumping main (karimanal pumping station to stilling chamber at bypass junction) 0.7 6 12-01-2019 100%
37 TVM Sewerage (A) 350mm DI K9 PM from well at Kulathoor to stilling chamber at Arasumoodu 1.03 6 27-03-2019 100%
38 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kuravankonam ,Vikramapuram Hills c- under Sewerage Section,Sasthamangalam 0.065 6 21-10-2018 100%
39 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-46 to 53- under Sewerage Section,Sasthamangalam 0.085 3 31-03-2019 100%
40 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Kadappathala line from MGRA-56 to 72- under Sewerage Section,Sasthamangalam 0.124 6 21-10-2018 100%
41 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Kowdiar ward , Bhagavathi line C-15 and C-16- under Sewerage Section,Sasthamangalam 0.154 6 31-03-2019 100%
42 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Laying 200 mm SW sewer line in Nethaji Bose road , Marappalam near Keni bridge from NBRA H-1 to NBRA H-10 under Sewerage Section,Sasthamangalam 0.065 6 30-03-2019 100%
43 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Right R C area – under Sewerage Section,Sasthamangalam 0.1276 6 30-10-2018 100%
44 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Central R C area – under Sewerage Section,Sasthamangalam 0.1269 6 30-10-2018 100%
45 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in West R C area – under Sewerage Section,Sasthamangalam 0.1023 4 12-09-2018 100%
46 TVM Sewerage AMRUT SAAP 2017-18 – Rehabilitation- Dismantling of damaged brick manhole and re constructing with RCC manhole in West R C area under Sewerage section , Sasthamangalam 0.087 8 10-12-2018 100%
47 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 1 0.2 6 24-03-2019 100%
48 TVM Sewerage TSS – Raising of Manhole covers in various wards under Sewerage Sn. 2 0.2 6 27-03-2019 100%
49 TVM Sewerage TSS-Rehabilitation and upgradation of existing sewer network at Thycadu MG Radhakrishnan Jn towards Poundkulam 0.25 4 25-09-2018 100%
50 TVM Sewerage AMRUT SAAP -2017-18 -TSS- Raising of manholes under tarred surface and replacing of RCC cover slabs with C I M H cover with frame in Left R C area – under Sewerage Section,Sasthamangalam 0.1228 6 28-06-2019 100%
51 KLM WS Improvement of existing WS System-Replacement of contaminated AC pipe lines in Kollam Corporation. 1 21 30-09-2018 100% Existing distri.system improved
52 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation (Laying 110mm PVC 2500m, 90mm PVC 4500m). 0.46 14 11-03-2017 100% Existing distri.system improved
53 KLM WS Improvement of existing WS System- Division No. 7 to 11 in Kollam Corporation – Replacement of damaged pumpset. 0.76 4 16-03-2017 100% Existing distri.system improved
54 KLM WS Improvement of existing WS System-Replacement of 50HP/75HP VT pumpsets at booster pumphouse at Ananathavalleeswaram. 0.55 6 01-03-2017 100% Existing distri.system improved
55 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to Tubewell pumphouses in Kollam corporation. 0.141 12 30-11-2017 100% Existing distri.system improved
56 KLM WS Improvement of existing WS System-Supply,errection and commissioning of Chlorinator system to booster pumphouse at Ananathavalleeswaram with 100Kg Chlorine cylinder. 0.086 15 30-07-2017 100% Existing distri.system improved
57 ALP WS Digital Survey and soil testing 0.5 6 months 08.03.2018 Digital survey completed
58 KOC WS Replacement of 250mm CI pipe by 300mm DI K9 pipe along Konthuruthi road of Kochi Corporation 2016-17 0.82 8 15.03.2019 100%
59 KOC WS Laying of 450mm DI (K9) pipe from north end of Aroor Edakochi bridge to KWA water tank site at Edakochi. 1.52 6 25.03.2019 100%
60 KOC WS Construction of 15L Ltrs. capacity GL tank at Karuvelippady in Kochi Corporation 3.2 12 30.06.2019 100%
61     Replacement of 100mm AC pipe by laying rider line of 160mm PVC (6kg/cm2) along both side of Pandit Karupan road of Kochi Corporation 2016-17 1.75 4 30.06.2019 100%
62 TCR WS AMRUT-Supplying and fixing bulk flowmeters in the transmission mains under Thrissur Corporation area 1 10 27-06-2018 8 bulk meters installed (100%)
63 TCR WS AMRUT- Supplying laying ,testing, commissioning and maintaining of 700 mm DI K9 raw water gravity main from Dam to aerator of 36 mld WTP at Peechi. 1 10 28-09-2017 370 Meter 700mm pipe supplied and layed(100%)
64 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package III 1.025 9months 25.06.2018 50 connections
65 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VII 0.539 6 months 12.10.2018 100 connections
66 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package I 1.5 6months    
67 KOZ WS Rehabilitation of existing old pipes, valvesand interconnections with the existing lines – phase 2- packageII 4.1 6 months    
68 KOZ WS Rehabilitation of existing old pipes, valves and interconnection with the existing lines (Phase II) – Package VI 0.8 6 months 27.12.18 99 connections
69 KOZ WS Rehabilitation of old pipes, valves, interconnections with existing lines and providing water meters in Kozhikode Corporation – Package VI 0.849 9months 15.2.2019 NRW reduction
70 KOZ WS Rehabilitation of existing old pipes, valves and interconnections with existing lines – Phase-2- package V 2.8 6 months 19.2.2019 NRW reduction
71 KNR WS Supplying & Laying new distribution line at Pallikunnu & Puzhathi area providing house connection & inter connection with existing line 3.2 11 28-02-2018  
72 KNR WS Laying new distribution line and providing new service connections at Elayavoor 8 9 30-06-2019 Beneficial for 7453 households