ATAL MISSION FOR REJUVENATION & URBAN TRANSFORMATION
The Prime Minister of India launched AMRUT on 25th June 2015
AMRUT KERALA launched on 1st September 2015
Total number of projects: 1022
Total Outlay of the projects: 2357.69 Crore
Fund Sharing Pattern: Central Assistance – 50%, State – 30%, ULB – 20%
- Water supply system, Augmentation of existing water supply, Water treatment plants, Universal metering.
- Rehabilitation of old water supply systems and treatment plants.
- Rejuvenation of water bodies and recharging of ground water.
- Special water supply arrangement for difficult areas, hill and coastal cities and those having water quality problems (e.g. arsenic, fluoride).
- Decentralised, networked underground sewerage systems, including augmentation of existing sewerage systems and sewage treatment plants.
- Rehabilitation of old sewerage system and treatment plants.
- Recycling of water for beneficial purposes and reuse of wastewater.
Construction and improvement of drains and storm water drains in order to reduce and eliminate flooding.
- Construction & improvement of Footpaths/ Walkways, Sidewalks, Foot Over Bridges and facilities for non-motorised transport (e.g. bicycles).
- Multi-level parking.
Development of green space and parks with special provision for children, senior citizens and Divyang friendly components.
- Improving delivery of citizen services
- Bringing down the cost of delivery
- Improving financial health of Urban Local Bodies
- Augmenting resources
- Enhancing transparency.
- Improving institutional outcomes by Individual Capacity Building and Institutional Capacity Building.
- Enhancing the functional knowledge
- Improving the job related skills
- Changing the attitude of municipal functionaries.
9 AMRUT MISSION CITIES
6 CORPORATIONS
Thiruvananthapuram, Kollam, Kochi, Thrissur, Kozhikode & Kannur
3 MUNICIPALITIES
Alappuzha, Guruvayur & Palakkad
WATER SUPPLY
- 6 Water Treatment Plants (Capacity: 265 MLD)
- 20 Water Tanks (Capacity: 135 Lakh Litre)
- 1462 Kilometer Water Supply Network
- 36149 water tap connections
- 155 out of 217 Projects completed
- Expenditure: 1192.35 Cr. (81.56%)
SEWERAGE & SEPTAGE MANAGEMENT
- 9 Sewage Treatment Plants (Capacity: 27.70 MLD)
- 5 Septage Treatment Plants (Capacity: 320 KLD)
- 100 out of 152 Projects completed
- Expenditure: 243.18 Cr. (69.16%)
STORM WATER DRAINAGE
- 389 Km. Stormwater drainage network
- 1093 out of 1304 water logging points eliminated
- 493 out of 536 Projects completed
- Expenditure: 285.04 Cr. (84.62%)
URBAN TRANSPORT
- 75.58 Kilometer Footpath
- 17 Foot Over Bridges
- 1 Skywalk
- 1 Subway
- 7 Multi-level parking
- 105 out of 128 Projects completed
- Expenditure: 125.11 Cr. (65.99%)
GREEN SPACE & PARKS
- Total Area:33 Acre (23 Acre covered)
- 72 out of 78 Projects completed
- Expenditure: 37.91Cr. (82.10%)
REFORMS IMPLEMENTATION
- Reforms Incentives received : Rs. 59.82 Crore (7th Rank with average score of 82.49% for Kerala)
- Street Light Replaced as part of Energy efficiency: 1.84 lakh
- Energy auditing done& 31 Pumps replaced
- Credit Rating : Completed for 9 cities & 2 Cities are eligible for issuance of bond (TVM & KOCHI)
- Formulation of GIS based Master Plan : Master Plan for 9 Mission cities has been published for suggestions and objections
- Local Area Plan & Town Planning Scheme (LAP&TPS) : Preparation progressing in Thiruvananthapuram City
- Single Window Clearance System for Building Plan approval: State Reforms under AMRUT. Adopted by the State
CAPACITY BUILDING
- Total Functionaries Trained : 3722 Nos (Including Officials & Elected representatives)
- Orientation: 1202 Nos
- Training: 1101 Nos
- Training cum workshop: 1092 Nos
- Online training: 327 Nos
- Exposure visit done: 402 ULB functionaries